Save Jeju Now

No War Base on the Island of Peace

  • Home
  • About
    • History
    • 4 Dances of Gangjeong
    • 100 Bows
    • Appeal
    • Partners
    • Board
  • Blog
    • All Posts
    • Petitions
    • Arrests & Imprisonmentuse for all things related to arrests and imprisonment
    • IUCN WCC 2012
      • Appeals & Statements
      • Gangjeong-Related Schedule
      • International Action Week, Sept. 2-9
      • Motion
      • Special Edition Newsletter for the WCC 2012
  • Gallery
    • #7 (no title)
    • #8 (no title)
    • #6 (no title)
  • Press
  • Support
    • Act
    • Donate
    • Visit
  • Downloads
    • Monthly Newsletter
    • Environmental Assessments
    • Reports
  • Language switcher

Tag: budget


  • Gangjeong Rises Up in Anger at Lack of Budget Cuts for the Jeju Naval Base Project

    Police attack, a Jeju islander on top of a van in front of the naval site main gate. Image: Carole Reckinger

    In response to the news that the Jeju Naval Base project budget for 2013, 200,900,000,000 Won, was passed completely without any cuts by the National Assembly and the majority holding Saenuri Party, Jeju citizens, villagers, and activists rose up in anger with direct action. Three people were arrested.

    An activist chained beneath a van. Image: Carole Reckinger

    Two vehicles were parked in front of the gates to the naval base site and people chained themselves underneath. At one gate, Anglican priests held a prayer service and at the other another person climbed on the roof of a van wrapping himself in barbed wire. People surround the vehicle with their bodies, firewood, junk, and whatever else they can find as usual. Soon hundreds of police arrived. They surrounded the Anglican prayer service so that they couldn’t leave and join the other gate’s struggle. Then they moved to the main gate of the construction site.

    The van is towed away. Image: Carole Reckinger

    There police surrounded the people and made their usual “gochak” detention circles to throw the people in, blocking them from blocking the gate. One by the one, people were dragged away and thrown in the detention circles. Then they roughly knocked down the person on top of the van, without regard for his safety. He was arrested. Then they cut the chains off the person under the van and arrested him along with a person who was simply accompanying to check his condition, totaling three arrests. Finally the van was towed away and the cement trucks went in and out. But it took almost an hour and a half.

    It was a very heavy struggle which left many villagers and activists in tears. The police, seemingly indifferent, soullessly did their jobs and walked away.

    Tomorrow, in response to the lack of budget cuts their will be protests in Seoul and several people including Father Mun Jeong Hyun and Gangjeong Village Mayor Kang will shave their heads and begin fasting. The budget will now go to the final stage, the Budget and Balance Committee.

    A Gangjeong villager mourns the unceasing oppression and destruction of his hometown. Image: Save Jeju Now
    November 29, 2012

  • Samsung Tugboat Hits Broken Caisson

    Photo by Jeju Sori, Nov. 26, 2012/ A tug boat in the red circle submerged. See more photos by Jang Hyun-Woo, click HERE

     

    1.  A tug boat belonging to Samsung C & T hit a broken caisson and submerged during the night construction, spreading gasoline oil on the sea

     

    In the early morning of Monday, Nov. 26, the news on the illegal night time naval base construction on the sea rang the media.

    A 45 ton tug boat belonging to the Samsung C & T submerged beginning with its bow  around 12:10 am on Nov. 26 in the Gangjeong Sea where the navy-contracted companies are working for building the naval base. The sea wave and wind were strong during that night. And the accident site was about 100 meter distant from the coast of construction area.

    Photo by Jeju Sori, Nov. 26, 2012

    It was later confirmed that the tug boat hit a 8,800 ton caisson (a concrete structure of 20.4m height and about 8 stories apartment building size) in the sea, which has been one of seven caissons that have been broken and damaged  by the typhoon Bolaven at the end of this August and abandoned in the sea since then . The tug boat was to return back to Hwasoon port ( *40 minutes car distance from the village) after the caisson floating dock’s makeshift stationing of another 8,800 ton caisson

    It is weird that the company contacted the Seogwipo Coast guard after seven hours of incident.

    In the tug boat, there were 7 crews including captain. All those were rescued thanks to a dredging barge nearby. But the coast guard could not rescue the boat as of 9am.Nov. 27.

    Photo by Jeju Sori, Nov. 26, 2012

     

    The Seogwipo Guard mobilized security and express ship on the sea. It was known that about 10,000 liter of gasoline had been loaded on the boat. Despite prevention work for any oil leak, oli was leaked to the worry of environmental contamination.

    A peace activist, Jo Yak Gol writes:

    The navy and Samsung  were in emergent to brought kitchen cleaning material of 800 liter (about 60 bottles of 13 liter) to remove oil leaked in the Joongdeok Sea, Gangjeong village. It means they would pour  such chemical material into the Gangjeong Sea. [..]

    Seven caissons of which total production costs are 35 billion won and which have been abandoned in the sea four months ago by the typhoons greatly threaten maritime safety, being like reefs in the sea. Still the navy does not take any measure on those.

    The Gangjeong fishermen are angry, saying it is too dangerous for them to navigate fishing ship during the night since the navy has not equipped any proper safety facilities in the naval base construction. The fishermen says they were also at the risk of accidents many times. They say the navy keeps silent even though they protest to the navy on it. The navy-contracted workers themselves know it is too dangerous for them to navigate ships here so they cannot even retort back to Gangjeong fishers’ protest.

    The navy and Samsung’s reckless enforcement of construction has eventually bought another accident[..]

    The Gangjeong Sea located in the corner of  typhoon is improper for naval base because of powerful current of water and wind even in the routine time. Further the Government made a base design for US nuclear aircraft carrier, [nuclear submarines], and Aegis Destroyer. The Office of Prime Minister has even lied and manipulated a mere reference (*made by the Ministry of National defense) [as if it is the technical verification committee’s official report ] for cruise  to forcibly fit into the base design even though it never fits to it.

    According to the testimonies by the workers, the caisson have been unreliably built short of standard and cannot properly function. Won’t the caissons be trashed when they are buried as those unreliable are roughly stationed in the strong sea wave and wind, according to false layout?

    Reckless construction (destruction) even during dangerous nights has brought such incident. Is it weird that we have heard some crews were sick the other day but they were secretly cared for by visiting doctor and nurses to the barge? And how about the maritime environmental destruction? The rushing construction(destruction) is bringing such human and nature disasters. Cut all the budgets for the Jeju naval base project!

    Please remind:

    The Samsung C & T has been accused to the Prosecutor Office for its illegal operation on floating dock without inspection in the beginning of this year

    The Samsung C & T floating dock has hit three fishing ships of which two ships became to submerge and one ship sunk down on March 11, 2012 when it was to moor in the outer port of the Hwasoon port.

     

    Reference :

     

    http://www.jejusori.net/news/articleView.html?idxno=122988
    [속보] 삼성물산 예인선 제주해군기지서 침수
    2012.11.26 08:45:54

     

    http://www.jejusori.net/news/articleView.html?idxno=123008

    삼성물산 예인선, 8천톤급 케이슨과 ‘충돌’ 침수

    2012.11.26 11:50:17

     

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165737
    제주해군기지 공사현장 예인선 침수…선원 7명 구조
    해경, 경비함정 7대 투입 배수작업 전개
    012.11.26 09:10:52

     

    http://www.headlinejeju.co.kr/news/articlePhotoView.html?idxno=165780

    제주해군기지 공사현장 예인선 침수원인 “케이슨과 충돌”

    바지선에 연결해 침몰 막아…기름유출 우려

     

    http://www.mediajeju.com/news/articleView.html?idxno=137051

    해군기지 예인선 침수 원인은 케이슨과 충돌

    2012.11.26 12:56:14

     

    2. Meanwhile, the villagers made a statement on the Samsung C & T’s demand on the amount of loss for the delay of construction. Here is a statement(translated)

     

    Regrading the Samsung C & T’s demand on the amount of loss for the delay of construction

    It has been known through media that the Samsung C & T demanded 23 billion won for the loss and additional cost by the construction delay of the Jeju naval base (so called Civilian-Military Complex Harbor for Tour Beauty), while Daelim, another main-contract company of the naval base project is told to plan to demand on the loss, too. And it is informed that the Samsung C & T reported that the delay of construction occurred because of activities by opposition groups.

    To say in a word, it is like ‘the thief turns on the master with a club.’ The Samsung C & T got the order on the maritime construction of the outer facilities such as breakwater, becoming in charge for the 1st construction work area. If there was any  people’s activity of obstruction on construction, it was to point out on the uninstalled silt protectors, the measure on the reduction of floating materials, following the Environmental Impact Assessment. People were just stopping illegal construction since [the Samsung C & T] has enforced construction (destruction) even without proper installation of  immobile silt protectors among the double-layered silt protectors.

    If the Samsung C & T had proceeded construction with proper installation of silt protectors from the beginning and still there were activities of obstruction of construction, the Samsung C & T is right to assert its claim. However, its construction delay happened because it has been disclosed of its illegal constructions (destruction) so has gotten correction orders many times from the Jeju Island. The construction delay was more caused from the maritime condition that has not been ready due to strong wind such as typhoon.

    If it is a construction delay happened due to natural condition, it is righteous that a service order agency that has miscalculated the days of impossible construction for natural condition takes responsibility for it. If construction delay occurred because illegal construction was driven and disclosed, it is righteous that applicable company is punished, rather than the company says so and so on the compensation on the amount of loss. Therefore if the Navy Headquarter or Ministry of National Defense demands a right to indemnity against local residents, the world will laugh on it.

    Even though the construction might have been delayed because local residents repulsed back against construction, the state should naturally compensate for the construction delay. It is because the state has the responsibility for smooth construction with its [responsibility] of persuading local residents in its driving for a national policy. Further it is a [so called] security project in the words of the Government. The Government should be responsible for all the loss and legal disadvantage that have occurred, being awakened that the project has become rather destroying security, not only destroying a local community but even dividing citizens’ opinions on it.

    Gangjeong Village Association

    Nov. 26, 2012

     

    ……………………………….

    Reference

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165795

    “해군기지 공사지연 손실금 구상권?…천하가 웃을 일”

    강정마을회, 공사지연 손실금 청구 입장표명

    2012.11.26 15:21:03

     

    3. Otherwise there was an event called, Consolidate Solidarity for No Jeju Naval Base Campaign and Asia-Pacific Peace Movement

    Source: PSPD. Click HERE

     

    PSPD, Cafe Tongin (1F)/ PM08:00 Nov. 26 (Mon), 2012

    Sponsored by the People’s Solidarity for participatory Democracy

    The Story tellers who were invited were: Dr. Song Kang-Ho, Fr. Mun Jun-Hyun, Kang Dong Kyun, (Gagjoeng village mayor), Joseph Gerson (US), Liu Yintuo (China), Corazon Fabros (Philippines), and Kawasaki Akira (Japan)

    For more on it, click HERE

    (Post by Fielding Hong)

     

    4. 24 hour construction and 24 hour protest are continued 

    Photo by Jang Hyun-Woo/ Barricades to block the cement trucks. For more photos on 24 hour protest by Jang Hyun-Woo, click, here and here (Post by Regina Pyon)
    Photo by Jang Hyun-Woo/ 100 bows in the morning. For more photos on 24 hour protest by Jang Hyun-Woo, click, here and here (Post by Regina Pyon)

     

    Video by Jo Yak Gol (Source: Click here)

     

    Video by Ki Gami/ 11pm, Nov. 27 (Source: Click here/ post by Regina Pyon)

    November 27, 2012

  • Village mayor’s lawsuit against the Prime Minister to demand 0.9 cent solatium

    Photo by Jang Hyun-Woo/ On Nov. 23, village mayor Kang Dong-Kyun filed a lawsuit against the Prime Minister to demand on 0.9 cent solatium for betraying citizens.

     

    On Nov. 23, 2012, Kang Dong-Kyun, Gangjeong village mayor, filed a lawsuit against the Prime Minister, Kim Hwang-Sik, to demand 1 won solatium. 1 won is 0.9 cent by the US currency standard. Why? The below translation explains the purpose of the lawsuit that is hoped to be extended into citizens’ campaign to demand the Prime Minister to make an official apology, stop construction and cut all budgets on the Jeju naval base project.

    Prof. Shin Yong-In, Professor of the Law School of the Jeju University and legal advisory to the Village Association mentions in relation to it:

    “With the exposure by Jang Hana, National Assembly woman, on the technical verification committee meeting minutes and testimony by Prof. Kim Gil-Sou, member of the technical verification committee, in the Island Council inspection, it became completely clear that the Civilian-Military Complex Port for Tour Beauty is a fabrication. Therefore any justifications for construction drive and budget allocation have become disappeared [..] If that part becomes certainly AN ISSUE, our struggle will have tremendous power to bring construction to be stopped and whole budget to be cut [..] We should demand the Prime Minister to make an official apology for his deception to people and to stop construction (destruction). And the Presidential candidates should make public their positions on the Government that cheats  people”

    ( Korean language source: Click here)

    The Prime Minister should make an official apology to the people for his deceiving of them!

    Stop construction (destruction)!

    Cut all budgets on the Jeju naval base project!

    ………………………………………………………………

     

    Mayor’s statement

    : Filing a lawsuit against the Prime Minister, Kim Hwang-Sik, to demand 0.9 cent solatium

     

    1. On Feb. 29, 2012, ‘the result and measure plan on the technical verification on the port-entry & exit by cruise,’ related to the Jeju Civilian-Military Complex Port for Tour Beauty, was discussed in the National Policy Control meeting that Kim Hwangsik, Prime Minister, presided over. As the result of meeting, the participants in the meeting told to confirm that it is possible by and large for 150,000 ton cruise to enter and exit port of the the Jeju Civilian-Military Complex Port for Tour Beauty, decided to drive the construction such as dredging in earnest, to complete construction by 2015 as planned.

    2. Since then, the site of Gangjeong was transformed into a situation being alike a battle field where endless daily clashes occur between the navy that enforces construction (destruction) with the mobilization of police and peace activists that make efforts to stop it. For a year of 2012 alone, about 390 people have been arrested.

    3. However, on Nov. 19, 2012, it was exposed through the inspection by the Administration and Self-Governing Committee of the Jeju Island Council that the report by the technical verification committee meeting supervised by the Office of Prime Minister was framed on the condition that the Government doctored the meeting result to avoid layout alteration and construction stop, which was through the testimony by Prof. Kim Gil-Sou, Korea Maritime University, who has joined the technical verification committee meeting. It has  turned out that Government personnel [in the meetings of technical verification committee] raised [different opinion of] whether there is a firm need to change a harbor and bay design when as much as 150 billion won is more needed for the layout change for cruise to enter the port. It also turned out that the chairman of the technical verification committee meeting induced conclusion into the way that no construction stop is to be realized, he saying in person that it is the basic measure of the Government to conclude the verification matter, when various matters such as the talk that even the entry of military vessels are difficult, not to mention cruise ships, were raised in the meetings. It is also told that the Government changed the 2nd simulation result report by the Ministry of National defense as if it is the report that the technical verification committee has officially acknowledged even though it was a mere reference material. Prof. Kim Gil-Sou told in conclusion that he considers the base design was not for the civilian-military complex port from the beginning.

    4. Otherwise, according to the movie that Park Won-Chul, Island Provincial Council member, obtained, it turned out that the simulation was done with the use of four not two tug boats, different from the Government assertion. The government lied from the beginning to the end. As a result, it has become clear that the Civilian-Military Complex Port that the Government and navy have made so much propaganda is merely a fraud play against their citizens.

    5. In the old age of history, Confucius has told that three elements of security, economy and people’s trust are important in doing politics. He has also said if one should unavidably abandon one, the first should be security, second is economy, then the last one is people’s trust. The people’s trust to Government is the most important element for the Republic of Korea to exist. The Government cannot exist if it is not be trusted by people. Still the Government has thoroughly betrayed people as if it is the Jeju civilian-military complex port while it is in fact Jeju naval base. How can you trust the Government that betrays people. It should be an example that the Government who betrays its people is thoroughly punished so that Government cannot betray its people again.

    6. Since the decision by the National Policy Control meeting supervised by Kim Hwang Sik, Prime Minister, is based on the result of the inducement and manipulation of the result from the technical verification by the technical verification committee, Kim Hwang-Sik, the Prime Minister cannot avoid his responsibility for his intention or fault on it.

    7. Since I have been forced to take speechless mental suffering due to the decision of construction drive by the intention or fault like above, Kim Hwang-Sik, Prime Minister, is responsible for the compensation of solatium for my mental suffering.

    8. Now I became to make decision to demand solatium to Kim Hwang-Sik, Prime Minister, on my mental suffering. Even though I long to demand hundreds millions of solatium to him, as I, upon the naval base construction, became to have more than 150,000,000 won debt since I have had no time to spare to care for my household, my health has become worse, physically, too, and I suffer for insomnia, I made decision to demand only 0.9 cent to him in the hope that all the citizens join this lawsuit for solatium, and in symbolic sense as well.

    9. I demand Kim Hwang-Sik, Prime Minister officially apologize to deceive people even now and cancell the decision on the resumption of construction, based on the falsified technical verification report. If Kim Hwang-Sik, Prime Minister neglect my demand and continuously ridicule citizens, I will extend my lawsuit to demad 0.9 cent solatium into all citizens’ movement.

     

    Nov. 23, 2012

    Kang Dong-Kyun, Mayor of the Gangjeong village, as the starting runner for the lawsuit to demand 0.9 cent solatium

    (Korean language source: Click here)

    …………………………………………………………………………………..

    See also the Jeju Weekly, regrading the decision by the Office of Prime Minister on Feb. 29, 2012 and blast of the Gureombi Rock on March 7, 2012.

    http://www.jejuweekly.com/news/articleView.html?idxno=2444

    Seoul plans 1.7 trillion won investment in Gangjeong

    Naval base contractor gets police go-ahead for explosives use

    Friday, March 09, 2012, 09:21:06

     

    See also here on the  villagers’ refusal to accept the proposal by the Office of Prime Minister

    http://savejejunow.org/you-cannot-buy-us-with-money/
    “You cannot buy us with money!” Villagers dissipated the Prime Minister Office presentation again.

    Oct. 26, 2012

    …………………………………………………………………………………….

    People’s 24 hour protest and completion of the 3rd caisson

    Meanwhile, people’s 24 hour protest to stop construction vehicles went on. The night time entry/exit of cement mixer trucks resumed on Nov. 19 after 10 days ‘ absence. The 24 hour mobilization of police and people’s 24 hour protest resumed again, too.  Despite the weekend break, the whole scene will restart on Monday, Nov. 26, again.

    Photo by Lee Woo Ki/ People carry stones over night to stop the night time entry/exit of trucks . For more photos on night time protest by Lee Woo Ki, see here.

     

    Scene of violent oppression on protesters in the night of  Nov. 20.

    Video by Yange Gon (Source: Click here)

     

     

    Scene of the caisson production area on the Gureombi Rock, Gangjeong village , around 7am, Nov. 24, 2012, Saturday

    Video by Navi (Source: click here)

    The 3rd 3,300 ton caisson has been recently completed and is in the condition of being dried at the cost of human rights violation and environmental destruction during 24 hour construction that started on Oct. 25.

    November 25, 2012

  • Samsung C & T demands additional construction cost of 23 billion won, reasoning of delay, for people’s protest

     

    Photos by Lee Woo Ki/ During the 24 hour construction that started since Oct. 25, people slept in front of construction gates to stop the construction vehicles. For more photos by Woo Ki Lee, See here(Night) and here (day)

     

    It was confirmed on Nov. 23 that Samsung C & T that is in charge of the 1st work area of the Jeju naval base project has demanded the Ministry of National Defense (MND) additional construction costs of about 23 billion won, reasoning that its work in the naval base project is being delayed because of opposition groups’ obstruction of construction. According to Sisa Jeju, the personnel in the Samsung C & T have started to discuss on it with the MND about a month ago.

    Hearing that, the Gangjeong Vllage Association and opposition groups strongly refuted on it, saying it is illogical that people’s taxes are to be wasted by giving additional costs on illegal construction.

    The Samsung C & T reasons people’s protest for the delay of construction

    According to the Jeju Sori, the Samsung C & T said to it on Nov. 23 that it “is consulting with the MND regarding the payment on construction fees etc since the naval base construction has been delayed more than a year.”

    The Samsung C & T that is building the outer breakwater of the naval base has gotten from the MND project right on the 1st work area of the Jeju naval base project, which is about 300.7 billion (300.751,000,000) won sum of money for construction, as of Jan. 2010 standard.

    The 1st work area is of a large size project on constructing west breakwater of420 meter and south breakwater of 1,076 meter. Currently the Samsung C & T is preparing for the construction of breakwaters, building 8,800 ton caisson for each in the Hwasoon port, Andeok myon, Seogwipo City. See the map below.

    Source: See here/  Naval Base construction layout

    The matter raised by the Samsung C & T is about the delay of construction. It asserts that construction is being delayed since the Gangjoeng village Association and opposition groups against the naval base have obstructed the entry/exit of construction vehicles and invaded into the inner side of the construction site.

    In fact, the Samsung C & T started construction from February 2011 which was a delay from its original plan. Its current work rate reaches only about 20% (39.1 billion won), far behind its purpose of 80 % (248.7billion won) for November, this year. According to the Jeju naval base project committee, the total work rate as of November currently reaches only to 24.4 % (239.5 billion won) by the standard of executed budget, among the total construction cost of 980.5 billion Korean won. The work rate by the Daelim in the 2nd work area is known to be only 21.4%.

    It has been known that the Samsung C & T, analyzing that it could not carry out construction for more than 15 months because of obstruction on construction by the opposition groups against the naval base project, earmarked 23 billion won in the name of labor and construction material costs.

    It is known that the loss price has become bigger following the construction postponement as the rent fee for the expensive maritime dock facility that the Samsung C & T has taken for the west breakwater construction amounts 200,000,000 to 300,000,000 won a day.

    Navy personnel resonates to Samsung C & T, “the construction has been delayed about 14 ~15 months as the opposition groups occupied the Gureombi Rock area by the early period of September last year and obstructed construction by blocking construction vehicles and interrupting  barge movement since then, too. We will decide the matter of preservation on loss price by contacting each construction company through legal examination.” The completion year of the Jeju naval base project has been postponed from 2014 to 2015.

    Regarding the Daelim industry that is in charge of 2nd work area of mooring dock, east breakwater and formation on land area, the Sisa Jeju reports that the Daelim industry is demanding  the MND to preserve 1.5billion won of loss following construction delay, while the Jeju Sori reports that it has not demanded additional construction cost.

    Photo by Cho Sung-Bong/ 14th caisson that was made by Samsung C & T in the Hwasoon port is entering the Gangjeong Sea at the cost of environmental destruction on Nov. 15.  The vicinity of the Beom Island in the background of the photo is the UNESCO Biosphere Reserve  with the UNESCO-designated soft coral habitats.  The Island itself is the  UNESCO-designated Geology Park. Stationing caissons without verified simulation  is  a total ignorance of even the Island governor’s demand. For more, see here.

     

    People, even the National Assembly members, refute against corporate greed

    Upon such behavior of navy-contracted companies, not only the Gangjeong villagers but even the Jeju-based/origin National assembly members are infuriated using the phrase of ‘the thief turns on the master with a club.’ in their remarks.

    Kang Dong-Kyun, the mayor of the Gangjeong village said, “The Naval base is illegal construction. It was without proper procedure. And environment is being destroyed. “Billions of caisson that have become scrap irons ( due to unreliable construction) tell that.” (# One caisson is told to take production cost of 5 billion won)

    “The naval base construction project itself  has been filled with serous problems from the beginning process of location selection to the performance during and after environmental impact assessment. It is righteous to stop illegal destruction. “

    “You should not appropriate billions of construction costs with people’s tax again because illegal construction fee has been delayed. The 23 billion won that the Samsung C & T has demanded is absurd.” ”

    Go Gwon-Il, chairman of the Villagers’ Committee to Stop the Naval Base also pointed out. “Is the Samsung C & T really qualified to demand additional costs? The Samsung C & T has enforced construction without the installation of silt protectors on the sea last year. If the Samsung C & T had driven construction observing the law, it had not arrived into this situation. Wrong national policy cannot but be repulsed back by citizens’ resistance on it. The injustice of naval base construction should be first examined.

    Jang Hana who has constantly raised problesm on naval base emphasized that ‘The villagers and activists have stopped naval base construction since it is illegal. The demand by the Samsung C & T is like to “Save a stranger from the sea, and he´ll turn your enemy.”

    Kim Jae-Yoon, National Assembly man said, “Whole matters occurred because the MND has not properly carried out the subsidiary opinion of the National assembly. The Ministry of National Defense is constructing naval base under the cover name of civilian military complex port for tour beauty.”

    He also said that “The social costs of villagers’ suffering are much bigger than the large sum of money of construction that the Samsung C & T asserts. The MND should compensate the villagers not Samsung.”

    In case the Ministry of National Defense pays for additional construction fee to Samsung C & T, there could be raised of a claim for damage against the opposition groups such as the Gangjoeng Village Association. If then, it could be expanded to lawsuit war.

    Photo by Jang Hyun-Woo/ Catholic priest Moo Kyu-Hyun protests against illegal construction. See more photos on people’s protest, see here.
    Photo source: PSPD (People’s Solidarity for Participatory Democracy)  Hankyoreh newspaper, Nov. 22 Advertisement: People’s campaign to stop construction(destruction) and to cut whole 2013 budget on the Jeju naval base project. See the related site here
    4,582 citizens joined to fund the newspaper advertizement campaign.

    ……………………………………………………………………….

    Reference

     

    http://www.jejusori.net/news/articleView.html?idxno=122917

    삼성 공사방해 수백억 요구, 강정 “적반하장”

    2012.11.23  10:04:19

     

    http://www.sisajeju.com/news/articleView.html?idxno=165085

    제주해군기지 시공사, 공사지연 손실보전 230억 요구

    “해군기지 반대측 방해로 공사 늦어져”…국방부, 손실액 보전 법률검토

    2012.11.23  11:17:10

     

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165519

    삼성, 국방부에 ‘해군기지 공사지연’ 손실 230억 요구

    “230억 물어내라”…강정마을에 구상권 청구목적?

    2012.11.23  09:46:49

    http://www.jejudomin.co.kr/news/articleView.html?idxno=36535

    삼성, 해군기지 공사비 230억 추가 요구

    반대단체 방해 이유…강정마을회 등 강력 반발

    2012.11.23  12:48:56

    November 24, 2012

  • Villagers state on Island Council exposure and step for legal suit against the Island governor

    Photo by Cho Sung-Bong, in his photo essay, Nov. 20, 2012. For contents, see No. 3

     

    1. People’s Nov. 20 statement on the exposure of the Island Council on Nov. 19

    ( Translated. Original Korean statement can be seen here)

     

    Title: The ruling and opposition parties should cut the whole 2013 budget for the Jeju naval base project as the decision on drive for the Jeju naval base project by the national policy control meeting turned out to be a clear fabrication!

    In the inspection by the Administrative Self-Governing Committee of the Jeju Special Self-Governing Island Provincial Council yesterday on Nov. 19, it was confirmed again that the government has doctored the meeting results of the technical verification committee to finish the committee’s technical verification committee report in the earlier period without design change and construction stop, thanks to the testimony by Prof Kim Gil-Sou who has participated as a member of the technical verification committee managed by the Office of Prime Minister. It was also exposed that there were models of 4tug boats not two boats in the 2nd simulation of which the report was made public by the Office of Prime minister. Further it was also exposed that the report was not the technical verification committee officially acknowledged but a mere reference.’

    The Office of Prime Minister has officially taken the 2nd report, asserting its basis that it was manifested following the recommendation by the technical verification committee. However, it turned out that the 2nd simulation report is clearly a fabrication in content and procedure.

    Therefore the decision to drive construction by the national policy control meeting on Feb. 29, 2012, which was held based on the report, is regarded as not valid from the origin, too. In detail, the decision of the national policy control meeting came out based on the 2nd simulation report and was concluded on the premise that it is guaranteed for 150,000 ton cruise to enter/ exit of port and to safely come alongside the pier. The premise was conditioned though, that west jetty dock is structured into the changeable and navigation route is changed by 30 degree angle. As the very basis of the decision turned out to be fabrication, the decision by the national policy control meeting can not be established as valid any more.

    It was also confirmed that three dimension modeling on the harbor and bay set up in the 2nd simulation was processed borrowing the harbor and bay model established in the 1st simulation. It is a serious reason of disqualification because even though the 2nd simulation is a test formed on the premise of 30 degree angle navigation route, it directly borrowed the area-detailed basic resource for the case of 77 degree angle (vicinity of navigation route, current, wind direction and wind speed). Because it is a test processed even without investigation on the area-detailed geographical and natural conditions in the vicinities of  the 30 degree angle navigation route, it is a test that lost even the value as a report.

    The matter is that there is a great concern that the revival of the 3rd simulation agreed between the Jeju Island government and Office of Prime Minister could be processed, borrowed of three dimension model used in the 1st and 2nd simulation. It is told that it takes six months only for collection of the area-detailed basic resource and for composition on the three dimension model for targeted ships and harbor & bay. Therefore, given the current situation, there is a high possibility [for the Prime Minister and Island government] to borrow the 1st and 2nd simulation models for the 3rd simulation,

    However, we claim that the test lay-out should be inevitably carried out on the ground of clearly collected area-detailed basic resources to take fair and objective verification that the Jeju island government has emphasized many times. Also the researchers who led the 2nd simulation that was proved out to be fabrication should be excluded in the selection of the researchers to join the tests. It is because objectivity and fairness cannot be secured if the tests are processed by re-employing the scholars who have abandoned their consciousness.

    [To conclude] the 2013 budget of the Jeju naval base project (Civilian-Military Complex Port for Tour Beauty) of which only re-verification would take at least six months should be righteously cut.

    Thereupon, we demand like the below.

    Accepting the inspection result by the Administrative Self-Governing Committee of the Island Council yesterday(Nov 19), Governor Woo should revoke his position on the pass of the Jeju naval base budget and declare the demand on objective and fair simulation.

    We request the Island Council to deliver the inspection result of the Administrative Self-Governing Committee and to make efforts for the 2013 Jeju naval base budget to be wholly cut.

    To realize stop on construction and re-examination on project that Moon Jae-In, Presidential candidate has pledged, the Democratic United Party should not make any concession regarding the principle of budget cut before fair and objective verification

    Finally, the Saenuri party should agree with the whole budget cut for the 2013 Jeju naval base project , bearing in mind that it would be the critical elements in executing the national policy project to lose people’s trust on the Government and National Assembly to allocate budget for the project that does not secure fairness and objectivity such as of procedural flaws and in which unjust behavior such as layout flaws and unreliable construction would be confirmed.

    Nov. 20, 2012

    Gangjeong Village Association, Jeju Pan-Island Committee for the Stop of Military Base and for the Realization of Peace Island (26 groups), National Network of Korean Civil Society for Opposing the Naval Base in Jeju Island (125 groups)

     

    2. Villagers steps for legal suit on the reclamation matter

    ( Korean language reference: See here)

    Regarding the Island government’s license of the navy on the reclamation on public water and its surface in the Jeju naval base project (so called Civilian-Military Complex Port for Tour Beauty, the Gangjeong village entered for legal step on Nov. 20. The Gangjeong village delivered to the Island governor its application letter on the demand of the cancellation of the navy on the license on the reclamation on public water and its vicinity surface, demanding the governor to reply on his acceptance or denial of it by Dec. 5, 2012. The village said that if the Island governor rejects the application by the village or does not reply to the villagers by the defined date, it would enter the procedure on the lawsuit for the cancellation on the denial disposal on application, based on the law on the administrative lawsuit.

    On Oct. 22, 2012, the village has made public if Woo Keun-Min, Island governor does not cancel the navy of the license on the reclamation on the public surface and its water by Nov. 7, it would inquire him civilian and criminal responsibility for it.

    Reminder: The Navy Headquarter got the reclamation license on the public water and its vicinity surface from the Busan Regional Maritime Port Affairs and Port Office, without submission of diagnosis report on the date of March 3rd, 2010. It is an act that the Office permitted the reclamation license for the law-violating project, which is unlawful. Otherwise, the right to permission and cancellation on the reclamation construction on the public water and its vicinity surface was handed over from the Ministry of Land, Transportation and Maritime affairs to the Jeju Island in September, 2011.

    (See also Headline Jeju, Nov. 20, 2012 강정마을회, 제주도에 해군기지 매립면허 취소 요구)

     

    3. Illegal destruction of the Gureombi Rock  in violation of the EIA

     

    Translation of photo essay by Cho Sung-Bong on Nov. 20, 2012. See original Korean language version, here:

    ‘According to the ‘Agreed Contents of Environmental Impact Assessment,’regarding the Jeju naval base project, it reads that double-layers of silt-protectors should be installed during the maritime construction and use of Fall Pipes and land washing of sands and stones during the input of them into the sea should be carried out.

    However, construction(destruction) is being done with nothing above  is observed.

    Even though scattered dusts and maritime contamination have spread far wide, yet no measures have been taken.

    The article 26 of the law on the Environment Impact Assessment reads that ‘matter on the performance on agreed contents should be confirmed and necessary measures should be taken for the performance of it when agreed contents were not carried out.”

     

     

    4. Night time protest with the resumption of night time entry/exit of construction vehicles.

    Around 11 pm, Nov 20. it is common to be like this every night during night protest. But people don’t lose hope and optimism
    Around 11:20 pm Nov 20. Today small tower of stones. The police took away people’ stuffs of lumbers, bicycles, and other materials this evening. But people’s imagination will be unlimited. Tonight the police threw down all the stones, too, during their roughing out. so people built the stone tower again. it will be again and again over night.
    Around 3:30 am, Nov. 20, Police take away stones then the people will build the stone tower again. people are building stone tower repeatedly and the police are destroying them repeatedly, too.
    Around 7:30 am, Nov 21, People’s recovered tower, after police roughing out of them.
    November 21, 2012

  • Technical verification committee member’s exposure: Lies on the simulation report by the Prime Minister Office were clearly revealed in the Island Council inspection.

    Photo source: Jeju Sori, Nov. 19, 2012(above) and Media Jeju, Nov. 19, 2012(below)/ They are the scenes of  movie on simulation on the cruise entry/ exit of port in the Jeju naval base project (So called Civilian-Military Complex port for Tour Beauty). In the scenes, it is possible for cruise to come alongside the pier only by the support of four tug boats, which exposes that the Office of Prime Minister has thoroughly lied and hid on the matter. The movie was open to public by an Island Council member, Park Won-Chul, during the Island Council inspection session on Nov. 19, 2012. The Office of Prime Minister, ignoring the opinions by the technical committee, has adopted the report based on such newly lie-exposed simulation.  The simulation had been requested by the Ministry of National Defense to the Korea Maritime University through the Samsung C & T, which resulted in the Feb. 23, 2012 report. To see the contents on it, see No. 2

     

    1. Budget talk was postponed again. Pressures on the members of the National Assembly, including those of Budget and Balance committee should be increased.

     

    On Nov. 19, budget talk was postponed again because of gap between the parties but possibility of vote was implied, which may bring the ruling party’s forceful sole disposal on budget.

    The talk in the National Defense committee of the National Assembly on the 201 billion won of the 2013 Jeju naval base budget was postponed again following Nov. 7-8, 12 and 16.

    The general meeting of the National Defense committee could not even talk on the Jeju naval base budget because of gap between the parties. The ruling party insists the pass of budget as the original (or at least partical cut) but the DP insisted the whole cut.

    The chairman ( Ryu Seung-Min, ruling Saenuri Party) and coordinators ( Han Ki-Ho, Saenuri Party and Ahn Kyu-Baek, Democratic United Party) of the committee decided to hold a meeting again prior to the day’s general meeting but the concrete schedule was not decided yet. If gap between the parties is not to be narrowed, there is a possibility of vote that was mentioned by the chairman of the committee on Nov. 19.

    If vote is enforced, there is a possibility of the Saenuri party’s forceful sole disposal, excluding the DP, [if the DP opposes the vote itself.] that will bring the creeping and clash in the committee. The proportion of the committee is 9 from the Saenuri Party, 7 from the DP, and 1 of independent among the total 17 committee members.

    If the proposal on the Jeju naval base is to be passed by the National Defense committee, it will be examined again by the Budget and Balance Committee of the National Assembly (whose schedule is not known yet) that will bring final result probably by the end of December, which is after December 19 Presidential election . The whole numbers of the Budget and Balance committee members  are 51.

    Continuous pressure on the members of the National Defense and Budget and Balance committees will be important.

    Protest against the Jeju naval base project, Gangjeong village, Nov. 19, 2012/ The sign reads, “Cut the whole 200.9 billion won of the 2013 Jeju naval base project!’

     

    2. Important exposure in the Island Council inspection: Construction should be stopped and budget should be cut as total lies by the Office of Prime Minister were clearly proved out.

     

    Meanwhile on the same day, important testimony by a member of the [base design-] technical verification committee meeting (Prof. Kim Gil-Soo, Korea Maritime University) and simulation screening that shockingly exposed government lies were held in the Island provincial council (Administrative self-governing committee) during its inspection on the Promotion Committee on the Civilian-Military Complex Port for Tour Beauty.

    Related to budget matter, the Island council inspection clearly proves out that the remark by the Office of Prime Minister that it would hold simulation ‘show‘, accepting the demand by the Island government, is only an excuse to appropriate budget on base project next year, shutting down all the critiques on its enforcement of naval base construction.

    The main testimony by Prof. Kim Gil-Soo was that: The report on the result of the 2nd simulation by the Office of Prime Minister [on Feb. 23] is different from the proper position of the technical verification committee (on the entry/exit of 150,000 cruises in the Civilian-Military Complex Port for Tour Beauty project) who adopted its proposal in its 4th meeting on Feb.14, after its session from January 26 to February 14.

    It was also ‘confirmed’ that the Feb. 23, 2012 report that had been ordered by the Ministry of National Defense (MND) through Samsung C & T was adopted as a simulation verification report by the Office of prime Minister. The villagers have raised a big suspicion on it in March 27, 2012. See here.

     

    Reference: It is useful to remind that

    1. The President Lee Myung Bak declared to enforce the Jeju naval base project in the 4th anniversary of his inauguration on Feb. 22, 2012)

    2. Based on the above Feb. 23 simulation report, on Feb. 29, 2012, the Office of Prime Minister claimed in its nation policy control meeting that the Lee Myung Bak government has made a final decision in September, 2008, to build the Jeju naval base as the civilian-military Complex Port for Tour Beauty where the civilian and military co-exist together. The remark by the Office of Prime Minister was criticized by the critics for distortion of facts because it added that the port had been built ‘as the Jeju naval base by the agreement from the villagers in 2007.’ There has been no agreement by the majority of villagers on the project whatever it was named. Additionally when the base building was first decided under the Ex-Roh Moo-Hyun government, it was under a cover called ‘civilian-military PORT OF CALL,’ not the ‘civilian-military Complex PORT for Tour Beauty, ‘ a new cover under the Lee Myung-Bak government (refer to Cheong Wooksik, Oct. 25, 2012)

    3. The first simulation by the Ministry of National Defense(navy) was in 2009.

    Finally, it was confirmed that, with the current base design, it is not easy even for military vessels, not to mention cruise, to enter and exit port. There have been numerous investigations by people themselves on it that back such confirmation.  One of them is by the villagers themselves. Watch the video here.
    Photo: Jeju Sori, Nov. 19, 2012/ Prof. Kim Gil-Sou, a member of the technical verification committee formed under the Office of Prime Minister on Jan. 26, 2012,  has been recommended as a member of the committee by the Jeju Island. He is also a member of the civilian verification task force team of the Jeju Island.

     

    The focus of the Island Council inspection on the base design were:

    Whether there was a pressure by the Office of Prime Minister  on the committee’s discussion result, also related to the 150 billion won mentioned to be needed for change of base design

    Whether the 2nd simulation report by the Office of Prime Minister properly reflects the position of the technical verification committee

    Whether the base was originally designed solely for naval base

    Whether the base fits even for military vessels, not to mention 150,000 ton cruise

    During the National Assembly inspection on the government offices, there has been a suspicion that has been strongly raised that the Office of Prime Minister pressured the committee to adopt the result report for the base design not to be changed.

    Here is the rearranged translation of the Jeju media, mostly from the Headline Jeju.

     

    Photo: Headline Jeju, Nov. 19, 2012/ Island Council members, Park Joo-Hee and Park Won-Chul

     

    ◇ “From the beginning, the design was not for the civilian-military complex port.”

    Prof. Kim Gil-Sou pointed out that there were problems in the simulation data by the Ministry of National Defense in the beginning.

     

    Question by Park Joo-Hee, Island Council member:

    In the meeting minutes, the members of the technical verification committee, recommended by the Island Council to be the members of the committee, lastly asked to the navy personnel in charge of simulation, pointing out ‘Why is it that the simulation data of wind speed 15 knot while it should be set up to 27 knot’ and ‘navigation route is wrong.’ And there was the remark by the navy personnel that ‘It is because it is hard for cruise to enter[the port] if the data is set up to 27 knot.’

    Does it mean that the base design was not for the civilian-military complex port from the beginning?

    Answer by Prof. Kim Gil-Sou, technical verification committee member

    “We understand so. But I don’t know how the navy considers it.”

    Question by Park Joo-Hee

    “Given the contents of the 4th meeting minutes, it can be seen there was an outside pressure from the Office of Prime Minister. There appear remarks such as that the verification matter should be finalized in the early period.”

    Answer by Prof. Kim Gil-Sou

    “(The measure to finalize the matter quickly) has been maintained from the start to the end.”

     

    ◇ “There was no outside pressure. But [the committee members] must have felt such mood in the meetings.”

     

    Question by Park Won-Chul

    “Was there outside pressure from the chairman of the technical verification committee (on Chairman, Jeon Joon-Soo, please see here) and the Office of Prime Minister?

    Answer by Prof. Kim Gil-Sou

    “It was the chairman who worried about the possibility of construction stop and made remark on it. It became clear in the 4th meeting that the most worrisome thing for those was on the possibility of construction stop. We sensed that Office of Prime Minister was afraid of the possibility of construction stop if something advantageous to the Jeju [Island government] is brought on in the verification meeting.”

    Question by Park Won-Chul

    “Is it proper for us to see the reason that the Office of Prime Minister avoids construction stop is because the port has been designed ONLY as a naval base and there would be additional design costs [if the design is changed]? Is it proper for us to see that the chairman of the verification committee was clearly aware of that part, given many problems [in the design]?”

    Remark by Park Joo-Hee

    “There was a pressure from the Office of Prime Minister. It is confirmed.”

    Answer by Prof. Kim Gil-Sou

    “There was no outside pressure. But [the committee members] must have felt the mood in the meetings.”

     

    ◇ “ The 2nd simulation report by the Ministry of National Defense(MND) is not [the committee’s] proper report.”

     

    The next questions were related to the MND’s submission of 2nd simulation report on Feb. 23, as soon as the technical verification committee adopted its result report on Feb. 14.

    On the question of Prof. Kim’s view on the matter that the Samsung ordered works on simulation already before the the committee’s adoption of  its own report, here are Prof. Kim’s answers.

    Answer by Prof. Kim

    “We did not acknowledge the [Samsung report]. At first, we thought it is for a new simulation but we found later that [the Office of Prime Minister] was to replace [ours] to it, which had already been ordered in December.

    “(During the meeting) the government personnel asked us to hear the MND 2nd simulation. When we said we would not do that, they asked us again to take it as reference material. It was not our proper document. However, the government personnel changed their words later. They say as if we, the technical verification committee acknowledged it, but it is TOO WRONG. The committee has NEVER officially acknowledged it. That is why we have continuously claimed on correct simulation. Correct simulation has to be done even from now on.”

     

    ◇ Cruises can barely come alongside the pier only with the support by four (not two) tug boats

    The central and Island government have argued each other on the ‘show’ of simulation, on the supposition that 150,000 ton cruise can safely come alongside the pier with the support of two tug boats of 3,500 horse power.

    However, in the 2nd simulation movie made public during the Island Council inspection by Park Won-Chul, Island Council member, there are scenes that a cruise ship barely comes alongside the pier supported by  four tug boats.

    Given the movie, it is confirmed that the simulation was carried on with four tug boats during the entry/exit of cruise in all cases in the conditions of wind speed 27 knot and west part jetty harbor as the changeable.

    However in the MND report on the result of simulation verification, it recommends to operate two tug boats with 3500 HP in case of more than 24 knot wind speed in the south breakwater; and to rearrange harbor structure and operate two 3500 HP all the time so that it would relieve psychological pressure of using jetty dock when big cruise is operated in the west breakwater (conditioned by maximum 27 knot of wind speed)

    Prof. Kim Gil-Sou stated watching the movie. “It is not common that four tug boats follow cruise.” He also stated that it is for the first time he got to know it.

    According to him,

    “ Since the size of water surface area of cruise is big, it is impossible for cruise to come alongside the pier without four tug boats in the condition of wind speed 27 knot or more. When I pointed out that the entry of cruise would be difficult in the condition of a jetty dock in the west breakwater, [the design of the jetty dock] was changed to the changeable. However, changeable dock is very difficult to build from the point of view of harbor and bay engineering technology. The reason that it was changed to the changeable is because the (government and navy0 wanted to maintain its original purpose (construction without  base design change)

    Park Joo-Hee, Island Council member said, “ The Island government should be furious together on the objectively proved out facts today that; The tug boats are four not two; it was originally a design purely for naval base; It takes additional 150 billion won to change the design; even military vessels are difficult for entry and exit/and  the chairman of the committee remarked that there should be no construction stop.” She demanded construction stop and space for true discussion by the Island people.

    Park Won-Chul also demanded construction stop pointing out that there have been as much as 22 cases of violations of the license regulation of Public waters Act (the law on the reclamation on the public water and its vicinity surface )since last October , which have not been properly asked of responsibilities with charges. Park also demanded thorough measure against unreliable caisson production of which seven have been demanded by last typhoons through fact checks

     

    3. Still 24 night time entry/exit of construction trucks resumed in 10 days on Nov. 19

    The night time entry/exit of construction vehicles that started on Oct. 25 has been posed since Nov. 10, 2010. For the background of it, see here. On Nov. 19, the nightmare of 24 hour police mobilization and 24 hour people protest started again.

    Around 9am. Nov. 19, 2012/ Protesters blocking construction trucks
    Around 2:30 pm, Nov. 19, 2012/The construction companies poured down dirty water toward outside gate. The dirty water flew into the Gangjeong stream, one of the absolute preservation areas along with the Joongdeok coast to which the Gureombi Rock belongs.
    Around 2:30 pm, Nov. 19, 2012/ Dirty water from the naval base project committee building complex flows into the Gangjeong stream.
    Photo by Dolgorae Goon, Nov. 17, 2012/  Such crime like above happened on Nov. 17, Saturday, too.  For many more photos on the day, click here.
    Photo by Carol Rekinger/ Around 11pm, Nov. 19, 2012. For many more photos, click  here.
    Photo by Carol Rekinger/ Around 11pm, Nov. 19, 2012. For many more photos, click  here.
    Photo by Yange Gone/ Around 3am, Nov. 20, 2012. Sleepless people
    Photo by Lee Woo Ki/ Around 5am, Nov. 20, 2012.  Protestors barely sleep between police roughing out of them.

    ……………………………………………

    Reference:

    http://www.jejusori.net/news/articleView.html?idxno=122762
    결과도 조작하는데, 시뮬레이션 다시 한들 믿을수 있나
    2012.11.20 13:25:50

    http://www.jejudomin.co.kr/news/articleView.html?idxno=36479
    해군기지 크루즈 시뮬레이션 ‘엉터리’ 확인
    예인선 2척 아닌 4척…군함용 설계 불구 짜맞추기 행자위 행감서 동영상 공개 …김길수 교수 증언도
    2012.11.19 19:26:01

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165252
    제주해군기지 ‘거짓말’ 들통…”애초 민군복합항 아니었다”
    총리실 기술검증위 참여 김길수 교수, 도의회 출석 반박 증언
    ‘2차 시뮬레이션 보고서’?…’외압’?…’예인선 4척’?
    2012.11.19 18:35:16

    http://www.jejusori.net/news/articleView.html?idxno=122721
    총리실 크루즈 입출항 조작지시 의혹 사실로
    [행감] 총리실 검증위원 김길수 교수 참고인 출석 “시뮬레이션 보고서 인정 못해”
    2 012.11.19 17:19:13

    http://www.jejusori.net/news/articleView.html?idxno=122706
    총리실 검증위원 제주도의회서 무슨 말할까?
    2012.11.19 13:38:12
    [행감] 한국해양대 김길수 교수 참고인 출석…박원철 의원, 삼성물산 시뮬레이션 CD 입수

    http://www.jejusori.net/news/articleView.html?idxno=122722
    정부, 15만톤 크루즈 예인선 2척 필요도 ‘거짓말’
    2012.11.19 17:29:25

    http://www.mediajeju.com/news/articleView.html?idxno=136790
    “15만톤급 크루즈 선박 시뮬레이션, 처음부터 허구였다”
    박원철 의원 해군기지 입출항 시뮬레이션 동영상 최초 공개 … 예선 4척 사용 확인
    2012.11.19 16:41:55

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165256
    국회 ‘제주해군기지 예산’ 처리 연기…막바지 표결처리?
    유승민 “쟁점 합의안되면 표결로라도 처리”
    과반의석 확보 새누리 단독 처리 가능성도
    2012.11.19 19:50:50

    November 20, 2012

  • Island governor sides with the navy on budget despite suspicious breakwater construction before simulation


    Photo by Cho Sung-Bong/ The 14th caisson. Despite the Island governor’s demand to the navy on Oct. 30 to stop the input of caisson on the sea until the finish of simulation on 150,000 ton cruise, the navy thoroughly ignores that. The navy-contracted company, Samsung C & T moved the 14th 8,800 ton caisson from the Hwasoon port to Gangjeong sea on Nov. 15. See more photos by Cho, here.

     

    During both days of Nov. 16 and 17, issues regarding the budget on the Jeju navy base project were hot, especially with the Island governor’s request to the visiting Democratic United Party members to pass the budget on subsidiary condition. The villagers criticized on it with statement (see its translation on No.3). This article is a summary of four subjects during both days.

    The four subjects are:

    1. Even no discussion: National Assembly discussion on budget was postponed again because of gap between the parties.
    2. Controversy on the matter of fair simulation
    3. Island governor, Woo Keun-Min, sides with the navy. Villagers criticize his will to pass the budget
    4. Suspicion on the navy’s enforcement of breakwater construction before simulation is raised.
    …………………………………………………………………………………………………………..

    1. Even no discussion: National Assembly discussion on budget was postponed again because of gap between the parties.

     The Jeju media report:

    The National Defense committee of the ROK National Assembly had the plan to hold the 3rd Budget and Balance sub-committee meeting in the morning of Nov. 16. It was to talk on the direction on the disposal on the 200.966 billion won budget for the Jeju naval base project, 2013. However the committee could not even discuss on it.

    The Budget and Balance sub-committee has had the meetings on Nov. 7 to 8 and Nov. 12 but those have been with no result as the parties could only confirm different positions between them.

    The National Defense Committee plans to have its general meeting on Nov. 19, Monday, and will try to reach to an agreement. If it is without result again, it will consider on opening the Budget and Balance sub-committee again.

    In the Nov. 19 meeting, talks on the Jeju naval base and inspection on K2 tank will be talked.

    The biggest reason that the disposal on the Jeju naval base budget has met difficulty is because of big gap between the ruling and opposition parties.

    The ruling Saenuri Party (New Frontier party) is insisting its position to pass the budget as the original proposal by the Defense Acquision Program Administration (DAPA). However the Democratic United Party (DP, afterward), the main opposition party has different opinions of whole cut, part cut and conditional pass within the party.

    The National Assembly has cut 96% (127.8 billion won) of 132.7 billion budget last year. However, unused budget of about 107 billion won in 2011 was transferred to 2012 with law-evasive way.

    How you can help? Please pressure as seen in No. 2 of here. The pressure works.

     

    2. Controversy on the matter of fair simulation

    Otherwise, regarding the decision by the Office of Prime Minister on Nov. 15 that it would ‘show’ (not ‘verification) on the simulation of 150,000 ton cruises, accepting the request by the Jeju island government, anti-base groups criticized on it on Nov. 16, saying, “The [Office’s] acceptance on simulation means that the Office acknowledges itself that there was problem on the trust matter in the 2nd simulation.”

    The groups including the Gangjeong Village Association, Pan-Island and National Organizing Committees  to stop the Jeju naval base, criticized that the Prime Minister Office’s acceptance of simulation is merely to pass the budget on the naval base project.

    The groups also said:

    “However, the limitations in the conditions of simulation that the Jeju Island government and Office of Prime Minister agree with each other are too clear to clarify on the citizens’ suspicions on the safety of the navigation by 150,000 ton cruises . The Jeju Island government has asked simulations on five types but the Office reduced them into two because the Office hard pressured the Island government to concede it.

    The groups also pointed out:

    “Among the three researchers in the ‘show’ team, two are recommended by the Government. Further one of them, Lee Yoon-Suk, professor of Maritime University has already brought serious controversy on objectivity and fairness matters in his order of service in the second simulation [of which the report came out on Feb. 23, 2012].”

     

    Reference:

    On July 18, 2012, the Jeju-based or origin four National Assembly members of Kang Chang-Il, Kim U-Nam, and Jan Hana (All DP) have raised an issue that the 2nd simulation on the control of ships, which should be based on observing regulations, has not been properly carried out. The four members pointed out that there are serious flaws in the 2nd simulation and demanded the Government and navy temporary stop of construction and observance on the National Assembly subsidiary opinion in 2011.

    In October, 2011, the sub-investigation committee on the Jeju naval base project that belonged to the Budget and Balance Committee of the National Assembly recommended to the Government to “verify on the matter of free entry/exit of port for two 150,000 cruises through the specialized 3rd institute in need. However, the Ministry of National Defense unilaterally carried out simulation and made public the 2nd report in February 23, 2012.

    Otherwise, the Ministry of Land, Transportation and Maritime Affairs submitted its opinion statement to the four members around July that it is desirable to carry on simulation again because there is a great risk of danger by occurrence of accident, with the low variables given in the 2nd simulation scenario.

    (See the Korean language Hankyoreh article on July 18, 2012)

     

    3. Island governor Woo Keun-Min sides with the navy. Villagers criticize his will to pass the  budget

    Four members of the Democratic United Party, belong to the Budget and Balance Committee of the National Assembly visited Woo Keun-Min, Island governor in the afternoon of Nov. 16. The four members are Park Min-Soo, Yang Seung-Jo, Choi Min-Hee and Choi Jae-Sung.

    The total number of the members in the Budget and Balance Committee is 51. Among them, 21 belong to the DP.

    To people’s indignation, the Island governor Woo asked the DP members to pass the budget on the condition that they stipulate the ‘subsidiary opinion’ of the National assembly last year. To be concrete, he suggested to stipulate that ‘[the Government] execute budget on the premise that the recommended items by the sub-investigation committee on the Jeju naval base under the Budget and Balance Committee of the National Assembly last year to be carried out in substance.” (For detail, see the reference in the below)

    Hearing the governor, the four members promised to the governor that they would actively support for the proposed items by the Jeju Island governor in the National Assembly. However, it is still uncertain for the DP as the party has taken construction stop and re-examination of project as the party opinion since April 11 general election, despite its recent being stirred regarding budget.

    Source: Jeju Sori, Nov. 16, 2012. Governor Woo (right in the photo) asked four visiting members of DP belong to the Budget and Balance Committee of the National Assembly to pass the budget on naval base on Nov. 16, 2012.

     

    Here is the villagers’ statement refuting on the governor’s such behavior (translated from the original Korean statement):

     

    Why does Island governor, Woo Keun-Min represent the interest of navy?

    Island Governor Woo has finally revealed his hidden intention.

    While he has shown his shifting attitude many times such as in the hearing on the navy in May when he was even seem to consider to make order the navy to stop construction, [on Nov. 16] he requested to [the visiting four DP members] to pass the budget [on the Jeju naval base project] with subsidiary conditions as the budget got brake in the National Assembly.

    It has been clearly turned out that the Jeju naval base is a project that would make the Jeju Island to be militarized with the posturing cover of civilian-military complex. The proof is that it is conditioned that ships’ entry and exit of port is only possible under the permission of jurisdiction unit commander in the revision on the enforcement order on Protection of Military Bases and Installations Act. It has also been exposed that the CNFK (Commander of US Navy Forces of Korea) has demanded the layout possible for nuclear aircraft carrier to come alongside the pier and it has been accepted in building of it.

    Through exposed meeting minutes by the technical verification committee under the Minister of Prime Office, we could also confirm the will of the Government who is to drive the project without base design change. The Prime Minister office accepted the joint simulation show to merely pass the naval base budget next year in its hidden intention. It is the calculation of timing that it is to that extent only once the National Assembly passes budget biting the [government acceptance] of simulation verification that could be done only next year.

    Combining all those situations. it is clear that the ROK Government neither concerns with the interest of the Jeju Island nor the public sentiment of the Island people. It is mad only to drive for military base project, hammering away to ignore even the position of the Jeju Island that is stepping toward international tourism site and whose role of bridge in the international civilian diplomacy is being promoted.

    Meanwhile the Jeju naval base project committee has enforced construction (destruction) hourly ignoring the demands by the Island governor. As if deriding his words that there should NOT be breakwater construction before verification, it is enforcing actual breakwater construction by stationing caisson, only without sands filled inside, and processing reclamation in the Metboori (* east tip of the project area) for the construction of breakwater shore protection. (See the below)

    In such situation, governor Woo demanded to the National Assembly to pass the 2013 Jeju naval base budget when the Office of Prime Minister agreed with re-revelation on simulation, which is not re-verification. Even though he says he conditioned that the budget should be executed under proper verification, there is no reason that Island governor demand to pass the budget since the budget that might be passed by then purely comes from the Ministry of National Defense, not from the Ministry of Land, Transportation and Maritime Affairs.

    Why does governor Woo demand the budget from the Ministry of National Defense?

    Is he entirely forgetting that he is the governor of the Jeju Special Self-Governing Island?

    Is he naively expecting that the navy would step for proper verification if it is allocated with budget?

    Why is he requesting to pass the budget in prior to a proper simulation while the navy could be re- allocated with special budget after it as it wants?

    Finally it was proved out that the Island governor Woo Keun-Min has no concern with whether the Jeju naval base would be a proper civilian-military complex port for Tour Beauty or not; and whether the Island people would get any damage from it or not. We don’t need Island governor who takes the lead as the representative of the navy and save only the interest of Samsung and Daelim.

    Nov. 17. 2012

    Gangjeong Village Association

    Reference:

    On Nov. 7, 2011, the sub-investigation committee on the Jeju naval base project under the Budget and Balance Committee of the National Assembly stipulated two recommendation items when they adopted its activity report.

    The first was the recommendation to revise the enforcement decree on the Port Act and Enforcement Decree on Protection of Military Bases and Installations Act and to conclude on the protocol on the joint use on the civilian-military harbor and bay, so that there should be no worry that the Jeju naval base would be operated centered on military port.

    The second is a fair simulation on the possibility of entry & exit by 150,000 ton cruises

    The revision on the decree has been carried out on June 29 while the talks on the conclusion on the protocol is still being processed and there remains the matter of simulation verification. The Jeju Island expects the simulation period at the end of December or January, next year.

    Otherwise, beside budget, governor Woo requested supports on other budgets. Among them, one of the noticeable is request for service work on the ‘basic plan to form the global environmental herb,’ which is for smooth drive of following measure after the 2012 WCC (0.7 billion won)

    (Translated: See the Jeju Sori on Nov. 16, here)

     

    4. Suspicion on the navy’s enforcement of breakwater construction before simulation is raised.

     

    On Oct. 18, 2012, Governor Woo has declared to the villagers in the talk meeting with them that he would ‘stop the breakwater construction in the Gangjeong Sea without fail’ even though it is difficult for him to order construction stop before simulation.”

    On May 1, 2012, even Park Geun-Hye, the daughter of military dictatorship and Presidential runner of the ruling conservative Saenuri Paty said that simulation verification has to be prior to construction on break water. See the Korean article on it here.

    However, the village has raised suspicion on Nov. 17 that the construction being done in the Metboori coast(in the east tip of the naval base project area) could be breakwater construction.

    Source: Jeju Sori, Nov. 17, 2012 (Original source: Gangjeong Village Association)/ Construction in the Metboori coast (east tip of the project area). In the map, the spot is marked with red color,  planned to be the east breakwater shore protection. The current construction on the spot  raises a suspicion that the navy is enforcing construction on breakwater by reclaiming land from the sea before simulation verification.  For more photos by Cho Sung-Bong, see here. The east part is also for docks for submarines and small ships.

     

    Given the photos by movie director Cho Sung-Bong, the sands and stones being put into the sea are in violation of the EIA. Those should be put into the sea after the washing process on the land. There is no washing facility for sands and stones inside the construction area and those coming from the field are directly put into the sea.”

    “The biggest problem is that substantial breakwater construction is being done. Given the photo (above), it is the area spot being reclaimed from the Metboori coast to the sea, along the silt protectors. This area belongs to the east breakwater shore protection ( * in charge of Daelim) and outer facilities on the base layout map.”  See the construction map here.

    “ not only that, the navy is processing the substantial construction on the west and south breakwaters, too, by stationing caissons. By when will the Island government on-look companies’ such law-evasive construction.

    Source: Headline Jeju, Nov. 17, 2012/ Working ships to station caissons to build west breakwater.
    Source: Headline Jeju, Nov. 17, 2012/ Working ships to station caissons to build southbreakwater.

     

    ………………………………………………..

    Reference

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165031
    국방위, 제주해군기지 예산 진통…또 다시 처리 연기
    예산소위서 결론 못내…19일 전체회의서 이견조율
    2012.11.16 12:25:18

    http://www.jejusori.net/news/articleView.html?idxno=122626
    제주해군기지 예산 진통, 19일 전체회의서 논의
    2012.11.16 11:54:40

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165052
    강정-범대위 “총리실 시뮬레이션, 공정한 검증 이뤄져야”
    “총리실 수용은 객관성과 공정성 문제 스스로 인정한 것”
    2012.11.16 15:16:55

    http://www.jejusori.net/news/articleView.html?idxno=122634
    제주해군기지 시뮬레이션, 공정성 논란 고개
    2012.11.16 14:40:00

    http://www.jejusori.net/news/articleView.html?idxno=122562
    시뮬레이션 준비만 4~6주…올해 불가능할 듯
    2012.11.15 10:34:53

    (http://www.hani.co.kr/arti/society/area/543194.html
    “해군기지 2 차 시뮬레이션 중대 오류”
    제주 출신 국회의원, 공사 중단 요구
    국토부”선박 출입때 사고 위험 커”
    2012.07.18 19:25

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165050
    국회 예결위 의원들 제주 방문, 예산요청 사안 현장확인
    민주당 소속 의원 4명…우 지사와 면담
    2012.11.16 15:00:30

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165112
    ‘제주해군기지 예산’ 조건부 통과 건의에 강력 반발
    강정마을회 “우근민 지사는 왜 해군의 이익 대변하나”
    2012.11.17 11:28:51

    http://www.jejusori.net/news/articleView.html?idxno=122648
    내년 제주해군기지 예산, ‘부대의견’ 달아 승인?
    2012.11.16 17:18:38

    http://www.sisajeju.com/news/articleView.html?idxno=164430
    해군기지 예산 난항…국회 예결위 민주의원들 제주지사 만나
    제주도 “예산승인시 부대의견 명시”건의…산지천 현장방문
    2012.11.16 18:07:34

    http://www.jejusori.net/news/articleView.html?idxno=122661
    강정 “방파제공사만큼은 안한다더니•••”
    2012.11.17 13:59:22

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165121
    “검증도 안하고, 이미 제주해군기지 방파제 공사 시작?”
    강정마을회, ‘매립공사’ 조기착수 의혹 제기
    2012.11.17 15:11:35

    November 18, 2012

  • No night time entry of trucks for a week. What’s happening?/ Night time construction noise has brought complaints from Hwasoon residents

    Photo by Jang Hyun-Woo on Nov. 11/ ‘The blue-roofed housed are inferred to be the residential buildings by  workers.’ See Jang’s more photos of construction site where destruction is being done in thorough violation of the EIA, see here.

     

    1. Workers’ sabotage? Not confirmed yet.

    There have been no night time entry/ exit of cement mixer trucks since last Saturday, Nov. 10. Even though it is told that 24 hour construction is continued inside the construction site. As of Nov. 16, it became a week that cement mixer trucks did not enter or exit the gates in the nights. The police would withdraw from the field in the evening and people could fortunately take break in the nights. On Nov. 16, the last struggle in front of the construction gates was at around 5:40 pm since there were no more trucks and police withdrew after it.

    What’s happening? Is it just a part of normal process for caisson production that needs care period by the next caisson production? Or are the police tired to be mobilized in the nights since they think the navy is crazy, too, to rush for the construction even in the nights?

    There is information that needs much more factual check. So this is just for reference. According to information that should be checked in various aspects, it is told that the Korean workers inside the construction site are sabotaging, intending to rebel against unfair work management.

    It has been known that about 100 workers from Vietnam and other countries have entered into the naval base construction site in the village just before 24 hour construction (destruction). We could imagine their poor work conditions, exploited with low wages.

    And it seems Korean workers are also exploited, which should be never surprising news.

    According to  information, the navy-contracted companies hiring Korean workers laid off them after the workers were mobilized to teach Vietnamese workers how to work.

    In the morning of Nov. 16, peacekeepers in the protest field were told that the construction company unilaterally laid off 18 workers. A laid-off worker coming out of the site told people.

    Beside 18 laid off Korean workers, it is told that some Vietnam workers quit the jobs that morning because they felt so cold to stay inside the containers in the coast within the construction area.

    Regarding 18 laid-off Korean workers, they are workers all working with reinforced rods. There were originally 30 workers working with reinforced rods and now 12 workers are left. The company has made two caissons and the 3rd caisson has been posed in process. It is told that Vietnamese workers would fill the empty job spots.

    While the daily wage of a Vietnam worker is 60,000 won, a South Korean worker gets 150,000 won, it is told. The Korean workers are told to wonder why such so-called important national policy project is built by foreign workers and why the Vietnamese workers often take records of photos on construction site with their mobile phones.

    It is told that while the director of the field is the one who has worked in Hwasoon, the workers here in Gangjeong construction site are employed by the Daelim-subcontracted company called the Jeju T & C, of which the headquarter is told to be in Seoul and which they have never been informed before. The workers were employed from all over the country and there is no specific leader among them.

    The workers have originally been told from the construction company that they would get 4 million won for a month for two years with the job. But the 18 laid-off workers could not get any dismissal allowance since their work term was less than two months. According to the Ministry of Labor, dismissal allowance is given to workers of more than three months. To be worse, they could not get wage from the companies yet. It is told that the companies said to them that they would send wage through their bank accounts later.

    The unfair work management in the Jeju naval base project has already been exposed though in part in the Hwasoon workers’ case. See No. 3, here. The bad and suspicious work conditions for workers are being leaked…

     

    Update on Nov. 17: It is told that beside the Korean workers who are told to have intended strike, Vietnamese workers are also in the mood of organizing strike.  It is clear the caisson work inside the naval base construction site in the Gangjeong village is not being processed well. Even during the daytime on Nov. 17, Saturday, there were no more cement mixer trucks entering after 3:30pm. The police withdrew at the time. It is unusual considering that construction (destruction) has been going on by late evening on Saturday even before 24 hour construction.

    Also, it is told that the employees of navy-contracted security companies are complaining on illegal registration of companies (* for that, see page 4,  Nov. newsletter) and delayed payment of wages. They are in the move to file a suit on unjust employment to the Ministry of Employment and Labor.

    Still despite such already exposed unjust construction including unfair work conditions, on Nov. 17, the Seogwipo City Hall, being pressured by the navy, sent a notice  to the villagers that if the villagers are not volunteering to remove their sit-in tents across construction gates, it will carry on forceful execution of demolition of them. The villagers and peacekeepers are ready to fight to save the sit-in tents next week.

    It also became clear that the residential households nearby the construction site in the Gangjeong village are suffering for the noise during the night time construction. One resident told that she felt like in the hell when she heard the noise of crane during the night.

     

    2. Night time construction noise has brought complaints from Hwasoon residents

     

    Photo: Jemin Ilbo, Nov. 8, 2012, Caisson built in the Hwasoon port

     

    There is not only a matter of work conditions for workers. The 24 hour construction to build 8,800 ton caissons in Hwasoon port (40 minutes car distance eastward from the Gangjeong village) has already been complained by the nearby residents.

    The Jemin Ilbo on Nov. 8 reported (Excerpted translation):

    The residents in Dongha-dong and Ungeun-dong, Hwasoon-li, Andeok myeon (* myeon (township) is the subdivision of gun (county)), in the Seogwipo city are being damaged by the construction noise related to the production of caissons that are put in the naval base construction area in Gangjeong village.

    The residents are especially protesting to Samsung C & T, saying they are experiencing discomfort because of greater noise in the nights as the caisson production is being done for 24 hours.

    The residents have demanded to the Samsung C & T to stop construction from 10pm to 5am and to take prevention measures to reduce the damage by noise.

    However, the position of the Samsung C & T is that it must progress construction even in the night time, reasoning that the caisson production needs unstopping construction due to technical matter; that there would be problem in quality management if construction is stopped in the night; and that the construction period has been delayed for several months.

    Eventually there have been meetings in last September and at the end of October, by the related personnel to solve the civilian complaints on construction noise by the caisson productions, for which local residents, contracted company personnel, and government officers in the Seogwipo City and Andeok Myeon joined. However, solution measures have not been provided yet.

    Kim Tae-Un, Chairman of Hwasoon li stated that “The residents nearby the construction site are being harmed not to be able to sleep again if they woke up from sleep due to abrupt noise occurring from the cranes in the dead of night… Even though we have raised noise issue from the beginning of this year, it has not been properly settled. And the residents are now standing up against it”.

    …………………………………………………

    Reference

    http://www.jemin.com/news/articleView.html?idxno=298043
    심야시간에도 공사 소음 피해 극심
    화순리서 해군기지 투입할 케이슨 24시간 제작
    주민들 “밤 10시~새벽 5시 공사중단 해야”
    시공사 “공사기법•공기문제로 부득이 강행”
    2012 년 11월 8일

    …………………………………………………

    An interesting article to look at:

    http://english.hani.co.kr/arti/english_edition/e_international/560972.html
    Korean workers underpaid on US military bases
    Nov.16,2012 16:33 KST

    November 17, 2012

  • Gangjeong Village Story: Monthly News from the Struggle | November Issue

    In this month’s issue:
    National Grand March for Life and Peace Comes to a close, outrageous findings in National Assembly inspections, Jesuit priest imprisoned, illegal security company hired to guard the construction site, 24-Hour construction begins and much more!

    Download PDF

    November 16, 2012

  • Urgent: How you can help us to cut the budget overnight. Please take 1 minute/ People’s emergency press conference

    The National Defense Committee of the National Assembly will have its final meeting in the morning of Nov. 16, Friday, in Korean time. Its’ Nov. 12 meeting was dissipated because of wide gap between the ruling and main opposition party. But since then the Democratic United Party (DP), the main opposition party has shown its compromising attitude that it is considering to agree with the ruling Saenury Party (New Frontier Party) to pass all or part of the proposed budget on the Jeju naval base project, to the indignation of people. The people here have mobilized themselves to protest to the members of the DP through email, phone and SNS. There was people’s emergency press conference on Nov. 15. How you can help us overnight in short time? Please see the part 2 of this article.

    Photo by PSPD/ People’s press conference in front of the National Assembly on Nov. 15, 2012

    1. People’s emergency press conference on Nov. 15

    On Nov. 15, there was people’s emergency press conference to demand ruling and opposition parties to cut the whole  201 billion won of 2013 Jeju naval base project budget in front of the National Assembly at 1:30 pm. The Press conference was hosted by the Gangjeong Village Association, Jeju Pan-Island Committee for the Stop of Military Base and for the Realization of Peace Island (26 groups), National Network of Korean Civil Society for Opposing the Naval Base in Jeju Island (125 groups). Please watch Dungree video Here (Youtube). You can see the original Korean statement here (posted by the PSPD).

    Some points in the press conference statement read:

    Even though the Budget and Balance committee of the National Assembly 2011 has recommended the government and navy “to objectively verify on the safety matters of entry & exit of port and coming alongside & out of port by the 150,000 ton cruises through the 3rd institute,” the government and navy have ignored it. Despite that, the members of the ruling and opposition parties in the National Defense committee are to pass 200.9 billion won on the 2013 Jeju naval base project, without asking the matter on the execution on the National assembly recommendation item. The Jeju naval base project currently being enforced is in violation of the 2007 National assembly subsidiary opinion of ‘Civilian-Military Complex Port of Call,’ (* the Lee Myung Bak government has enforced the project under the title of the Civilian-Military Complex Port for Tour Beauty) and also in violation of the 2011 Budget and Balance committee of the National Assembly recommendation item, the demand of verification on the possibility of entry & exit by 150,000 ton cruises. It is a case when a strict response by the National Assembly is needed in the sense that those are of ignorance of the authority of the National assembly that monitors the Administrative. Therefore it is reasonable that the National Assembly cut all 2013 budgets on the Jeju naval base, according to the agreement between the ruling and opposition parties. […] However, Han Ki-Ho (* a former high-rank  army commander), member of the Saenuri Party, the person concerned in the ruling and opposition party’s agreement [in 2011] as a member of Budget and Balance Committee and now a chairman of the National defense committee  shows shameless appearance to condemn the voice on budget as if it is from that of pro North Korea.

    Photo by Tommy Shin Jung-Hyun/ People’s press conference to cut the Jeju naval base budget in front of National Assembly on Nov. 15, 2012

    There are some useful points to remind in the people’s protest letters to the two big ruling and opposition parties. Here are some excerpted translations.

    Protest letter to the Saenuri Party: Excerpts

    The government stated only today that it would accept the opinion by the Jeju Island government on simulation verification(It is in fact ‘revelation’ not ‘verification by the words of the Office of Prime Minister)‘. However, it has already been proved out that the [projected] port is difficult not only for 150,000 ton cruise’s entry-exit and coming alongside the pier but also for military vessels to properly enter and exit, through the meeting minutes by the ‘technical verification committee on the entry/ exit of cruse’ set up following the navy resource and National Assembly recommendation. Also construction has been unreliably, roughly-and-readily being done. So caissons that are to be used for port & bay construction have been completely destroyed, too. It is judged that the safety of port itself would not be guaranteed either.

    The Saenuri party thinks the Jeju naval base is certainly necessary for national security. However, if the Saenuri Party truly thinks security, it should take the lead to cut all budgets on the Jeju naval base project. It is because the Jeju naval base currently being constructed in Gangjeong has no validity for project purpose. It cannot even properly be used as a military port.

    The government takes protection of southern sea area and sea transportation lane as the purpose of the Jeju naval base project. However, there is no need to be stubborn to build the naval base in Jeju to protect the southern sea water. The government has already measure of the 3rd fleet in Mokpo that does not need another base in Jeju. Further the task of sea transportation lane is originally the duty of coast guard and it is never appropriate that military vessel steps for that, given the geographical conditions and relationship with nearby countries.

    Furthermore, it has been turned out through navy resource that the main facilities of the Jeju naval base are being designed and built according to the US military demand to fit for the vessels such as the US nuclear aircraft carrier [and submarines] that the US retain

    Protest letter to the Democratic United Party: Excerpts

    The remarks by Park Ji-Won, floor representative of Democratic United Party, who said that ‘[the party] would confirm on the test result on the entry/exit of port and then allocate budget,’ is never realistic, given the time to be taken for verification and schedule on budget review. Further in the situational condition that the Office of Prime Minister and navy enforce construction (destruction), ignoring the resolution by the National Assembly who demanded verification through simulation, there is no other alternative than to cut the whole budget (* so construction is to be stopped) to enforce verification. We worry  to see the words by [Moon Jae-In], Presidential candidate and [Park Ji-Won] floor representative to be over turned in a week.

    It seems that the reason that the Democratic United Party changed its position on the matter of cut on the Jeju naval base budget is because it judged that it would influence not  good effect in the Presidential election due to expected repulsion by the navy and conservative class and political aggression by the Saenuri party. However such position is defensive and passive without clear and reasonable basis.  In last [April 11] election, all the three Democratic United Party members who oppose naval base have been all elected in Jeju. If the candidate and Democratic United Party actively make public to citizens on various problems on the Jeju naval base in the mainland, it can get superior position in public opinion. The Democratic Party should take a lesson of a case that the people have rather punished the Grand National Party(former Saenuri Party) when the DP actively responded to the GP with the ‘war power vs. peace power’ frame,  facing against the GP who intended to win over DP in June 2 local election, abusing the Cheonan ship incident for hunting so called the ‘pro north-Korea’ groups.

    Photo by Hwang Hyun-Jin/ Humorous one man protest in front of National Assembly. ‘With 200.9 billion won, you can feed each of 50 million South Koreans with four strings of Kimbab (rice ball kind)

    Photo by Cho Sung-Bong/ Despite the Island governor’s demand to the navy on Oct. 30 to pose the input of caisson until the finish of simulation on 150,000 ton cruise, the navy thoroughly ignored that. The navy-contracted company is moving caisson on Nov. 14.  See more photos by Cho, here.

     

    2. URGENT: Please take 1 min. to help us. Please copy and paste the below and send it to these address below, with your name. You may change contents, of course. Thanks so much in advance.

    moonriver365@gmail.com, intoan429@hanmail.net,  2030minju@hanmail.net, kjy1@assembly.go.kr, jp311@assembly.go.kr, kmageneral@gmail.com , esh337@hanmail.net,  jinsj@assembly.go.kr

    ( Email address source: click here   )

    Title: Cut the whole budget on the Jeju naval base. The world is watching

    Dear Democratic United Party members of National Defense committee of the ROK National Assembly.

    Please cut all the budgets on the Jeju naval base project. I heard that your party is considering to agree with the ruling Saenuri party to pass the budget in all or part in the National Assembly.  It is a shame that your party considers it despite all illegal, undemocratic, environment destructive, human rights- violating matters of the Jeju naval base project that became clear to the eyes of internationals.  I was also shocked to hear that the Jeju naval base is nothing but the US base as the Commander of the US navy forces of Korea has intervened in the base design for US nuclear aircraft carrier and US submarines.

    Do you truly want the South Koreans’ tax paid for the US war base against China? It will greatly disturb peace in the North East Asia and world. Please remember that your deed will affect not only Koreans but voiceless creatures and people in the world.

    It is unbelievable and shame if your party agrees to pass the budget. Please stand on your original position of cutting all the budget of 201 billion won on the naval base project 2013.

    Thanks for listening.

     

    Photo by Carol Rekinga/ The hungerstrike of Sung Sim Jang, for more photos, click here
    Photo by Kang Han, Catholic News Now and Here/ Construction site, Nov. 13, 2012 (post by Regina Pyon)
    Photo by Kang Han, Catholic News Now and Here/ protest mass in front of construction gate, Nov. 12 (Post by Regina Pyon)

     

    3. Peace activists resist tenaciously and cry for stop of violence

    Please watch this 7 min. video taken by Kim Goon, a peacekeeper that daily appears in the protest site of the naval base construction gate. . The peacekeepers in Gangjeong persistently protest to stop the cement mixer trucks .The video was taken at 3:10pm, Nov. 14. They are fighting for the Jeju naval base project budgets not to be executed but cut, despite the police violence and humiliation.

    “All parts of our body are bruised… We have little time to inform about the field news since the start of 24 hour construction… All of us are longing the day when our routine life of being roughed out by the police will end…. We just hope to save the Gureombi, Gangjeong village and ourselves.” (Kim Goon)

    ( Youtube/ Source: Click here )

     

    Update on Nov. 16

    The police from Seoul were more violent on Nov. 16. They are the maneuver units of No. 21(male) and 24(female). The police were also violent on Nov. 15, probably because the Democratic United Party members showed compromising attitude on budget. A young activist was carried to a hospital during the protest on Nov. 15.

    ………………………..………………………

    Reference

     

    http://cafe.daum.net/peacekj/GeUz/169

    [11월 15일 기자회견] “2011년 국회 여야 합의-검증 없이 예산 없다”- 제주 해군 기지 예산 전액 삭감 촉구 긴급기자 회견

     

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=164947

    제주해군기지 시뮬레이션 검증 ‘합의’…”주야간 검증”

    총리실, 제주해군기지 시뮬레이션 검증 요구 전격 수용

    2개 케이스 시현…주야간 검증…책임연구원 교체키로

    2012.11.15  09:47:42

     

    http://www.jejusori.net/news/articleView.html?idxno=122564

    강정마을회 “민주당 전액삭감 입장 끝까지 지켜야”

    “새누리당 이상일 대변인 발언은 정치적 공세···민주당은 예산 전액삭감 입장 유지해야”

    2012.11.15  11:17:35

     

    http://www.jejusori.net/news/articleView.html?idxno=122559

    정부, 해군기지 15만톤 크루즈 시뮬레이션 수용

    2012.11.15  09:46:23

     

    http://www.catholicnews.co.kr/news/articleView.html?idxno=8445

    “강정마을, 예수처럼 쓰러져도 평화의 표지 될 것”

    ‘24시간 공사’ 이어지는 해군기지 앞 끈질기게 지키는 사람들

    2012.11.15  11:14:37

    November 16, 2012

←Previous Page Next Page→

© 2025

Save Jeju Now