Save Jeju Now

No War Base on the Island of Peace

  • Home
  • About
    • History
    • 4 Dances of Gangjeong
    • 100 Bows
    • Appeal
    • Partners
    • Board
  • Blog
    • All Posts
    • Petitions
    • Arrests & Imprisonmentuse for all things related to arrests and imprisonment
    • IUCN WCC 2012
      • Appeals & Statements
      • Gangjeong-Related Schedule
      • International Action Week, Sept. 2-9
      • Motion
      • Special Edition Newsletter for the WCC 2012
  • Gallery
    • #7 (no title)
    • #8 (no title)
    • #6 (no title)
  • Press
  • Support
    • Act
    • Donate
    • Visit
  • Downloads
    • Monthly Newsletter
    • Environmental Assessments
    • Reports
  • Language switcher

Category: English

For Posts in English


  • Samsung C & T demands additional construction cost of 23 billion won, reasoning of delay, for people’s protest

     

    Photos by Lee Woo Ki/ During the 24 hour construction that started since Oct. 25, people slept in front of construction gates to stop the construction vehicles. For more photos by Woo Ki Lee, See here(Night) and here (day)

     

    It was confirmed on Nov. 23 that Samsung C & T that is in charge of the 1st work area of the Jeju naval base project has demanded the Ministry of National Defense (MND) additional construction costs of about 23 billion won, reasoning that its work in the naval base project is being delayed because of opposition groups’ obstruction of construction. According to Sisa Jeju, the personnel in the Samsung C & T have started to discuss on it with the MND about a month ago.

    Hearing that, the Gangjeong Vllage Association and opposition groups strongly refuted on it, saying it is illogical that people’s taxes are to be wasted by giving additional costs on illegal construction.

    The Samsung C & T reasons people’s protest for the delay of construction

    According to the Jeju Sori, the Samsung C & T said to it on Nov. 23 that it “is consulting with the MND regarding the payment on construction fees etc since the naval base construction has been delayed more than a year.”

    The Samsung C & T that is building the outer breakwater of the naval base has gotten from the MND project right on the 1st work area of the Jeju naval base project, which is about 300.7 billion (300.751,000,000) won sum of money for construction, as of Jan. 2010 standard.

    The 1st work area is of a large size project on constructing west breakwater of420 meter and south breakwater of 1,076 meter. Currently the Samsung C & T is preparing for the construction of breakwaters, building 8,800 ton caisson for each in the Hwasoon port, Andeok myon, Seogwipo City. See the map below.

    Source: See here/  Naval Base construction layout

    The matter raised by the Samsung C & T is about the delay of construction. It asserts that construction is being delayed since the Gangjoeng village Association and opposition groups against the naval base have obstructed the entry/exit of construction vehicles and invaded into the inner side of the construction site.

    In fact, the Samsung C & T started construction from February 2011 which was a delay from its original plan. Its current work rate reaches only about 20% (39.1 billion won), far behind its purpose of 80 % (248.7billion won) for November, this year. According to the Jeju naval base project committee, the total work rate as of November currently reaches only to 24.4 % (239.5 billion won) by the standard of executed budget, among the total construction cost of 980.5 billion Korean won. The work rate by the Daelim in the 2nd work area is known to be only 21.4%.

    It has been known that the Samsung C & T, analyzing that it could not carry out construction for more than 15 months because of obstruction on construction by the opposition groups against the naval base project, earmarked 23 billion won in the name of labor and construction material costs.

    It is known that the loss price has become bigger following the construction postponement as the rent fee for the expensive maritime dock facility that the Samsung C & T has taken for the west breakwater construction amounts 200,000,000 to 300,000,000 won a day.

    Navy personnel resonates to Samsung C & T, “the construction has been delayed about 14 ~15 months as the opposition groups occupied the Gureombi Rock area by the early period of September last year and obstructed construction by blocking construction vehicles and interrupting  barge movement since then, too. We will decide the matter of preservation on loss price by contacting each construction company through legal examination.” The completion year of the Jeju naval base project has been postponed from 2014 to 2015.

    Regarding the Daelim industry that is in charge of 2nd work area of mooring dock, east breakwater and formation on land area, the Sisa Jeju reports that the Daelim industry is demanding  the MND to preserve 1.5billion won of loss following construction delay, while the Jeju Sori reports that it has not demanded additional construction cost.

    Photo by Cho Sung-Bong/ 14th caisson that was made by Samsung C & T in the Hwasoon port is entering the Gangjeong Sea at the cost of environmental destruction on Nov. 15.  The vicinity of the Beom Island in the background of the photo is the UNESCO Biosphere Reserve  with the UNESCO-designated soft coral habitats.  The Island itself is the  UNESCO-designated Geology Park. Stationing caissons without verified simulation  is  a total ignorance of even the Island governor’s demand. For more, see here.

     

    People, even the National Assembly members, refute against corporate greed

    Upon such behavior of navy-contracted companies, not only the Gangjeong villagers but even the Jeju-based/origin National assembly members are infuriated using the phrase of ‘the thief turns on the master with a club.’ in their remarks.

    Kang Dong-Kyun, the mayor of the Gangjeong village said, “The Naval base is illegal construction. It was without proper procedure. And environment is being destroyed. “Billions of caisson that have become scrap irons ( due to unreliable construction) tell that.” (# One caisson is told to take production cost of 5 billion won)

    “The naval base construction project itself  has been filled with serous problems from the beginning process of location selection to the performance during and after environmental impact assessment. It is righteous to stop illegal destruction. “

    “You should not appropriate billions of construction costs with people’s tax again because illegal construction fee has been delayed. The 23 billion won that the Samsung C & T has demanded is absurd.” ”

    Go Gwon-Il, chairman of the Villagers’ Committee to Stop the Naval Base also pointed out. “Is the Samsung C & T really qualified to demand additional costs? The Samsung C & T has enforced construction without the installation of silt protectors on the sea last year. If the Samsung C & T had driven construction observing the law, it had not arrived into this situation. Wrong national policy cannot but be repulsed back by citizens’ resistance on it. The injustice of naval base construction should be first examined.

    Jang Hana who has constantly raised problesm on naval base emphasized that ‘The villagers and activists have stopped naval base construction since it is illegal. The demand by the Samsung C & T is like to “Save a stranger from the sea, and he´ll turn your enemy.”

    Kim Jae-Yoon, National Assembly man said, “Whole matters occurred because the MND has not properly carried out the subsidiary opinion of the National assembly. The Ministry of National Defense is constructing naval base under the cover name of civilian military complex port for tour beauty.”

    He also said that “The social costs of villagers’ suffering are much bigger than the large sum of money of construction that the Samsung C & T asserts. The MND should compensate the villagers not Samsung.”

    In case the Ministry of National Defense pays for additional construction fee to Samsung C & T, there could be raised of a claim for damage against the opposition groups such as the Gangjoeng Village Association. If then, it could be expanded to lawsuit war.

    Photo by Jang Hyun-Woo/ Catholic priest Moo Kyu-Hyun protests against illegal construction. See more photos on people’s protest, see here.
    Photo source: PSPD (People’s Solidarity for Participatory Democracy)  Hankyoreh newspaper, Nov. 22 Advertisement: People’s campaign to stop construction(destruction) and to cut whole 2013 budget on the Jeju naval base project. See the related site here
    4,582 citizens joined to fund the newspaper advertizement campaign.

    ……………………………………………………………………….

    Reference

     

    http://www.jejusori.net/news/articleView.html?idxno=122917

    삼성 공사방해 수백억 요구, 강정 “적반하장”

    2012.11.23  10:04:19

     

    http://www.sisajeju.com/news/articleView.html?idxno=165085

    제주해군기지 시공사, 공사지연 손실보전 230억 요구

    “해군기지 반대측 방해로 공사 늦어져”…국방부, 손실액 보전 법률검토

    2012.11.23  11:17:10

     

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165519

    삼성, 국방부에 ‘해군기지 공사지연’ 손실 230억 요구

    “230억 물어내라”…강정마을에 구상권 청구목적?

    2012.11.23  09:46:49

    http://www.jejudomin.co.kr/news/articleView.html?idxno=36535

    삼성, 해군기지 공사비 230억 추가 요구

    반대단체 방해 이유…강정마을회 등 강력 반발

    2012.11.23  12:48:56

    November 24, 2012

  • We Want to Arm Gangjeong Village with Literature

    “Writers Action 1219” held the “Gangjeong Village Peace Library Proposal Ceremony” in front of the Jeju Naval Base project construction gate on November 21. 23 representatives from the group attended and joined the civil disobedience campaign, joined by activists, villagers, and Catholic fathers. Below is their official statement made at the ceremony. Click here For further details and pictures.


     

    We Want to Arm Gangjeong Village with Literature:
    Proposal for the Creation of a Gangjeong Village Peace Library


    As we stand here today each of us carries a book. We know that fire could turn this book to a handful of ashes. Water could turn it to a lump of batter. It could also be torn to pieces and scattered by the Gangjeong wind. But we know that it is the son of a tree, so it is the breath of the forest and the heart of nature. We know that the salamander and the red-foot crab live together in it, and the Aster Yomena and Cladium chinensis Nees plants grow together, and we know that life and anima are connected like the stonewalls of this village. Above all things, we know that the heart of this book is like the Gureombi Rock.

    Therefore, today, we would like to launch this villager and civil group cooperative project, the “Creation of the Gangjeong Village Peace Library”. For the red-foot crab to crawl, the Cladium chinensis Nees to sway, and for the natives’ laughter to be heard by those that pass through Gureombi. For the Sarangbang [a type of traditional Korean guestroom] of beautiful life to protect and live with this sea longer than billy clubs, guns, swords, and cannons. We will arm this village with hearts of hope, peace, and solidarity against their arms of domination, hegemony, and war.

    But literature does not occupy peace through destruction and replacement. We will not “build a library in Gangjeong Village” but “build Gangjeong village into a library”. We will clean and repair an old and empty house and connect homes to each other so that the whole village can be a library. We will create a library where adults can read books, children can dream, and together they can share stories, creating a presence of peace. This project will not end in a moment but will be forever with Gangjeong village.

    We are going to put our effort into creating the Gangjeong Village Peace Library.

    One, we will let everyone know about the meaning and necessity of the Peace Library through paper and action.
    One, we will share everything necessary for creating the Peace Library and actively participate in the particulars of preparation.
    One, we will steadfastly contribute to the Peace Library, the literature we have published thus far and will publish in the future.
    One, we will participate joyfully in various literature events, lectures, and etc., which the Peace Library will hold in the future.

    As we stand here today each of us carries a book. Tomorrow, we will become these books and protect this place as that book. Each letter in the book will crawl out like the Japanese mitten crab, wanting to see a recovered Gureombi, recovered lives, and a peaceful, beautiful Gangjeong Sea again. Because we believe literature is the food of Peace and solidarity for hope.

    We desire that villagers and civil groups participate together in the preparation of this project and our will is that this project will lead to the total annulment of the Gangjeong Village U.S. Naval Base.

    November 21, 2012
    Seong-ho Ham & Sun-woo Kim
    Gangjeong Village Peace Library Project “Writers Gathering” Preparation Representatives


    November 23, 2012

  • 「不合作主義」運動在江汀村風起雲湧

    Shin Yong-In教授於2012年11月公開發表:為了和平解決濟州島海軍基地計畫所造成的衝突,以及為了實現正義的法律,將加入江汀村的「不合作主義」運動,直到政府以及海軍停止強制執行海軍基地建設案。

    「我將以我的身體阻擋工程車輛進出海軍基地,」Shin Yong-In教授說。

    Shin, Yong-In教授於海軍基地前宣示加入不合群主義運動

    為何在江汀村推行「不合作主義運動」?

    Shin Yong-In教授表示:「當所有試圖阻止非正義支配性強權的所有法律上的努力變得無意義,對於強行進行中的海軍基地建案,再沒有甚麼是身為一位法學院教授以及一位律師的我可以做的了…。」

    2009年濟州道江汀村438名居民針對國防部長官提起訴訟,並要求法院判國防部取消濟州海軍基地建設計畫,對此,法院判決:韓國國防部於2009年時,在並未切實進行環境影響評估的情況下批准建設專案實施計畫,因此這一計畫無效。

    然而,2012年7月,韓國最高法院推翻原審中被告敗訴的判決,宣判國防部建設濟州海軍基地案為「合法」。韓國最高法院所做出的最新判決意味著,韓國國防部將可如期推進濟州海軍基地建設項目。

    合法與違法的定義在當權者的權勢下可一日變動,然而動搖不了因江汀村海軍基地一案而集結的維護正義與和平的意志。

    每日在江汀村海軍基地前以血肉之軀阻擋各式工程車進出海軍基地建設地的和平活動家們所阻擋的「不法工程」在韩国最高法院的判决出爐後,更鞏固了韓國警方對於和平活動家「和平非暴力阻擋工程建設的行動」上所扣的「妨礙業務」之罪名。並依此罪名進行掃除、逮捕、起訴、拘留等行動。五年間江汀村突起的驚人高犯罪率,以及濟洲道監獄「人滿為患」的諷刺情況讓許多隱藏的事實呼之欲出。

    端坐在海軍基地前的和平活動家所舉的抗議標牌中總少不了「釋放良心犯」之標語。這些人有人坐鎮工程現場,有人上法庭,有人蹲牢房,無一不是以身犯險。「這些人不顧遭受懲罰的風險,即便只能延遲工程速度5分鐘之久,仍義無反顧。他們是遵循『良心法』的人們,這些人已經實質上在進行一場和平的『不合作主義運動』。他們的勇氣讓曾經受到法律侷限的我感到羞愧,也促使我問自己:究竟何為『真法』,」Shin Yong-In教授表示。

    「Gureombi(註一)不合作主義運動」

    事實上,在Shin Yong-In教授公開賦予此和平運動為「不合作主義運動」之前,反對濟州島海軍基地運動中的許多村民以及和平活動家們早已以各類方式持續不斷地實踐此「不合作主義」運動之實際內容。

    江汀村的「不合作主義運動」紮紮實實地奠基在這許許多多有名、無名的小人物上,是一個自發性、草根性且具多元性以及創意性的「不合作主義運動」,依其獨特性又稱其為「Gureombi不合作主義運動」(註二)。

    為阻擋工程,為了維護自然、生命與和平的「Gureombi不合作主義運動」之型態多元如百花,在反對海軍基地運動的各式挑戰中綻放。

    譬如在海軍基地前靜坐,在工程車的通行之道路上唱歌跳舞、騎腳踏車、吃飯、舉行宴會、進行宗教儀式(禮拜、彌撒…)、創造大型藝術品、遍地作畫等等,搞地警察與工程保全人員頭昏腦脹,也有的人在可能的衝突現場進行「一步一和平」的「三步一拜」活動,為混亂的現場增添一絲平靜。

    和平活動家在海軍基地前靜坐以及在工程車通行之道路上作畫
    作家們在工程車通行的道路上擺上自己的書,以「和平圖書館」阻擋車輛通行
    「一步一和平」的「三步一拜」活動

    除了陸上的活動,反對海軍基地運動的「不合作主意運動」自然少不了水上活動。然而遭到政府貼上不良標籤的和平活動家,在海警以「防止未來犯罪」的名義下,竟連獨木舟都被強性禁止出海,不只是獨木舟遭禁,連游泳都不准。

    此舉非但剝奪了人民的自由,更剝奪了江汀村「Save Our Sea(SOS)海上不法工程監視團」出海監視海軍基地海上工程所造成的環境影響之權力。事實上,SOS團體已多次揭發了海上工程在違反環境影響評估的情形下祕密進行的不法案例,因此海警無理由地阻擋行為更是剝奪了市民進行環境監測的權力,也間接地為不法的環境破壞工程護航。

    在陸警以及海警合力阻饒下仍持續入海的SOS團體,曾經發起各式有趣的「海上不合作主義運動」。包括宣示海為萬物所共有的「海上Olley散步小路(註三)」活動、帶領市民透過海路再次佔領Gureombi岩石的海上獨木舟計程車活動等等。

    陸警阻擋SOS的獨木舟下水
    海警阻擋SOS獨木舟出海

    江汀村反海軍基地運動的「Gureombi不合作主義」運動的創意性,為許多遭到惡法、惡習所套牢的環境、和平運動開啟新的曙光。

     

     

    註一:Gureombi為江汀村Jungdoek海岸上的巨大火山岩塊,是許多村民的精神寄託。

    註二:「Gureombi不合作主義運動」之一般訴求有:

    -政府應該尊重憲法之規定:尊重人民的基本權利

    -濟州島海軍基地計畫應該被撤回

    -刪除2013年濟州島海軍基地計畫之2009億預算

    -濟州島海軍基地計畫應該蓋立即停工,因為此計畫的正當性是在謊言、背叛、法律規避(Evasion of Law)以及暴力下強制實行,因此也清楚的證明了其不法性。

    -政府、海軍以及警察應該立刻停止暴力

    -釋放所有良心犯

    -濟州島海軍基地計劃案的相關員工應針對國會對政府官員之審查中,所揭露出的問題負責

    註三:Olley小路為濟州島註明的環島健行步道。

    November 23, 2012

  • Coast Guard Illegally Blocks Boats in Public Gangjeong Port

    On Tuesday, November 21, several members of SOS (Save Our Seas), the Gangjeong ocean observation, monitoring, and action team, reunited after several months of focusing on other activities (and several members months long imprisonment). Four members, decided to take two kayaks, one turned into a homemade sailboat, out to the sea to observe the construction. Their plan was to circle the construction site legally from the outside, observe and take pictures and video. They also just to go out to sea for the first time in several months.

    The weather was a bit cold and overcast, but it was not dangerous or excessively windy and there were no sea weather warnings. All four members are excellent swimmers and kayakers as well as licensed divers. They also all wore heavy winter wet suits, both for warmth and safety. The members brought their kayaks to Gangjeong port, a small public port, and put their boats in the water. Upon doing so, the coast guard ran to them and began questioning them about their plans and motive. Since Korea is supposedly a free democracy and not a police state, the members merely replied that they were going to the ocean and felt no further need to give more details.

    Coast Guard boats intercept the kayaks

    As the SOS members got in the Kayaks and took off, they were suddenly surrounded by Coast Guard ships and officers. Without any announcement or information, the coast guard officers jumped in the water and began blocking the kayaks. They then grabbed the kayaks and began pulling and pushing them back to the shore. SOS members struggled nonviolently with the coast guard who continued to attack them and restrict their rights and freedom without any explanations.

    Finally after a lot of struggle, one coast guard official began to announce through a microphone that because there was a the construction site nearby, it might be possible that the SOS members would go inside and doing something illegal. He even referenced the June 30 action when Kim Dong-Won climbed a crane doing illegal dredging. Of course, this is outrageous as not only was Kim Dong-Won not aboard a Kayak but also his case is still currently on trial, meaning he is still innocent until proven guilty. Further it was outrageous that simply because there was a construction site in the area (hundreds of meters away, no where near where SOS was blocked while doing something completely legal in a public place. With that reasoning the police can stop anyone from doing anything if there is ever a chance of something illegal happening, which is always and everywhere!

    Coast Guard thugs block a swimmer.

    The struggle continued on and the SOS members went back to shore and then attempted to enter the water at several other places, every time illegally blocked and assaulted by the coast guard. They continued until it began to grow dark. At which point they returned to the land.

    It was an outrageous display of police stupidity and power (there were more than 20 coast guard officers to the 4 SOS), and total trampling on the rights of the SOS team members. It is clear that not only is Gangjeong a police occupation, but that the coast guard and the police are nothing more than free taxpayer paid security for construction companies, Samsung and Daelim. Many Korean coast guard members are very nationalistically proud of themselves for being in the coast guard, but they have nothing to be proud of. They are complicit in the destruction of Gangjeong Village, its people, heritage and culture, and the destruction of the environment, including the very sea that they are sworn to protect. This is both pathetic and shameful.

    More pictures available below:

    SOS members prepare their homemade sailboat kayak.
    Entering the water, ready for the journey.
    Coast Guard officers block the sailboat kayak.
    Not giving up, the SOS members got out of the water and entered again at another location. They were blocked again, this time by even more coast guard boats and officers.
    While being trapped by the Coast Guard, the SOS members found an old damaged silt protector, which again raised concerns about whether the construction site is using the required environmental protection.
    The silt protector viewed from underwater.

     

    November 22, 2012

  • Villagers state on Island Council exposure and step for legal suit against the Island governor

    Photo by Cho Sung-Bong, in his photo essay, Nov. 20, 2012. For contents, see No. 3

     

    1. People’s Nov. 20 statement on the exposure of the Island Council on Nov. 19

    ( Translated. Original Korean statement can be seen here)

     

    Title: The ruling and opposition parties should cut the whole 2013 budget for the Jeju naval base project as the decision on drive for the Jeju naval base project by the national policy control meeting turned out to be a clear fabrication!

    In the inspection by the Administrative Self-Governing Committee of the Jeju Special Self-Governing Island Provincial Council yesterday on Nov. 19, it was confirmed again that the government has doctored the meeting results of the technical verification committee to finish the committee’s technical verification committee report in the earlier period without design change and construction stop, thanks to the testimony by Prof Kim Gil-Sou who has participated as a member of the technical verification committee managed by the Office of Prime Minister. It was also exposed that there were models of 4tug boats not two boats in the 2nd simulation of which the report was made public by the Office of Prime minister. Further it was also exposed that the report was not the technical verification committee officially acknowledged but a mere reference.’

    The Office of Prime Minister has officially taken the 2nd report, asserting its basis that it was manifested following the recommendation by the technical verification committee. However, it turned out that the 2nd simulation report is clearly a fabrication in content and procedure.

    Therefore the decision to drive construction by the national policy control meeting on Feb. 29, 2012, which was held based on the report, is regarded as not valid from the origin, too. In detail, the decision of the national policy control meeting came out based on the 2nd simulation report and was concluded on the premise that it is guaranteed for 150,000 ton cruise to enter/ exit of port and to safely come alongside the pier. The premise was conditioned though, that west jetty dock is structured into the changeable and navigation route is changed by 30 degree angle. As the very basis of the decision turned out to be fabrication, the decision by the national policy control meeting can not be established as valid any more.

    It was also confirmed that three dimension modeling on the harbor and bay set up in the 2nd simulation was processed borrowing the harbor and bay model established in the 1st simulation. It is a serious reason of disqualification because even though the 2nd simulation is a test formed on the premise of 30 degree angle navigation route, it directly borrowed the area-detailed basic resource for the case of 77 degree angle (vicinity of navigation route, current, wind direction and wind speed). Because it is a test processed even without investigation on the area-detailed geographical and natural conditions in the vicinities of  the 30 degree angle navigation route, it is a test that lost even the value as a report.

    The matter is that there is a great concern that the revival of the 3rd simulation agreed between the Jeju Island government and Office of Prime Minister could be processed, borrowed of three dimension model used in the 1st and 2nd simulation. It is told that it takes six months only for collection of the area-detailed basic resource and for composition on the three dimension model for targeted ships and harbor & bay. Therefore, given the current situation, there is a high possibility [for the Prime Minister and Island government] to borrow the 1st and 2nd simulation models for the 3rd simulation,

    However, we claim that the test lay-out should be inevitably carried out on the ground of clearly collected area-detailed basic resources to take fair and objective verification that the Jeju island government has emphasized many times. Also the researchers who led the 2nd simulation that was proved out to be fabrication should be excluded in the selection of the researchers to join the tests. It is because objectivity and fairness cannot be secured if the tests are processed by re-employing the scholars who have abandoned their consciousness.

    [To conclude] the 2013 budget of the Jeju naval base project (Civilian-Military Complex Port for Tour Beauty) of which only re-verification would take at least six months should be righteously cut.

    Thereupon, we demand like the below.

    Accepting the inspection result by the Administrative Self-Governing Committee of the Island Council yesterday(Nov 19), Governor Woo should revoke his position on the pass of the Jeju naval base budget and declare the demand on objective and fair simulation.

    We request the Island Council to deliver the inspection result of the Administrative Self-Governing Committee and to make efforts for the 2013 Jeju naval base budget to be wholly cut.

    To realize stop on construction and re-examination on project that Moon Jae-In, Presidential candidate has pledged, the Democratic United Party should not make any concession regarding the principle of budget cut before fair and objective verification

    Finally, the Saenuri party should agree with the whole budget cut for the 2013 Jeju naval base project , bearing in mind that it would be the critical elements in executing the national policy project to lose people’s trust on the Government and National Assembly to allocate budget for the project that does not secure fairness and objectivity such as of procedural flaws and in which unjust behavior such as layout flaws and unreliable construction would be confirmed.

    Nov. 20, 2012

    Gangjeong Village Association, Jeju Pan-Island Committee for the Stop of Military Base and for the Realization of Peace Island (26 groups), National Network of Korean Civil Society for Opposing the Naval Base in Jeju Island (125 groups)

     

    2. Villagers steps for legal suit on the reclamation matter

    ( Korean language reference: See here)

    Regarding the Island government’s license of the navy on the reclamation on public water and its surface in the Jeju naval base project (so called Civilian-Military Complex Port for Tour Beauty, the Gangjeong village entered for legal step on Nov. 20. The Gangjeong village delivered to the Island governor its application letter on the demand of the cancellation of the navy on the license on the reclamation on public water and its vicinity surface, demanding the governor to reply on his acceptance or denial of it by Dec. 5, 2012. The village said that if the Island governor rejects the application by the village or does not reply to the villagers by the defined date, it would enter the procedure on the lawsuit for the cancellation on the denial disposal on application, based on the law on the administrative lawsuit.

    On Oct. 22, 2012, the village has made public if Woo Keun-Min, Island governor does not cancel the navy of the license on the reclamation on the public surface and its water by Nov. 7, it would inquire him civilian and criminal responsibility for it.

    Reminder: The Navy Headquarter got the reclamation license on the public water and its vicinity surface from the Busan Regional Maritime Port Affairs and Port Office, without submission of diagnosis report on the date of March 3rd, 2010. It is an act that the Office permitted the reclamation license for the law-violating project, which is unlawful. Otherwise, the right to permission and cancellation on the reclamation construction on the public water and its vicinity surface was handed over from the Ministry of Land, Transportation and Maritime affairs to the Jeju Island in September, 2011.

    (See also Headline Jeju, Nov. 20, 2012 강정마을회, 제주도에 해군기지 매립면허 취소 요구)

     

    3. Illegal destruction of the Gureombi Rock  in violation of the EIA

     

    Translation of photo essay by Cho Sung-Bong on Nov. 20, 2012. See original Korean language version, here:

    ‘According to the ‘Agreed Contents of Environmental Impact Assessment,’regarding the Jeju naval base project, it reads that double-layers of silt-protectors should be installed during the maritime construction and use of Fall Pipes and land washing of sands and stones during the input of them into the sea should be carried out.

    However, construction(destruction) is being done with nothing above  is observed.

    Even though scattered dusts and maritime contamination have spread far wide, yet no measures have been taken.

    The article 26 of the law on the Environment Impact Assessment reads that ‘matter on the performance on agreed contents should be confirmed and necessary measures should be taken for the performance of it when agreed contents were not carried out.”

     

     

    4. Night time protest with the resumption of night time entry/exit of construction vehicles.

    Around 11 pm, Nov 20. it is common to be like this every night during night protest. But people don’t lose hope and optimism
    Around 11:20 pm Nov 20. Today small tower of stones. The police took away people’ stuffs of lumbers, bicycles, and other materials this evening. But people’s imagination will be unlimited. Tonight the police threw down all the stones, too, during their roughing out. so people built the stone tower again. it will be again and again over night.
    Around 3:30 am, Nov. 20, Police take away stones then the people will build the stone tower again. people are building stone tower repeatedly and the police are destroying them repeatedly, too.
    Around 7:30 am, Nov 21, People’s recovered tower, after police roughing out of them.
    November 21, 2012

  • Technical verification committee member’s exposure: Lies on the simulation report by the Prime Minister Office were clearly revealed in the Island Council inspection.

    Photo source: Jeju Sori, Nov. 19, 2012(above) and Media Jeju, Nov. 19, 2012(below)/ They are the scenes of  movie on simulation on the cruise entry/ exit of port in the Jeju naval base project (So called Civilian-Military Complex port for Tour Beauty). In the scenes, it is possible for cruise to come alongside the pier only by the support of four tug boats, which exposes that the Office of Prime Minister has thoroughly lied and hid on the matter. The movie was open to public by an Island Council member, Park Won-Chul, during the Island Council inspection session on Nov. 19, 2012. The Office of Prime Minister, ignoring the opinions by the technical committee, has adopted the report based on such newly lie-exposed simulation.  The simulation had been requested by the Ministry of National Defense to the Korea Maritime University through the Samsung C & T, which resulted in the Feb. 23, 2012 report. To see the contents on it, see No. 2

     

    1. Budget talk was postponed again. Pressures on the members of the National Assembly, including those of Budget and Balance committee should be increased.

     

    On Nov. 19, budget talk was postponed again because of gap between the parties but possibility of vote was implied, which may bring the ruling party’s forceful sole disposal on budget.

    The talk in the National Defense committee of the National Assembly on the 201 billion won of the 2013 Jeju naval base budget was postponed again following Nov. 7-8, 12 and 16.

    The general meeting of the National Defense committee could not even talk on the Jeju naval base budget because of gap between the parties. The ruling party insists the pass of budget as the original (or at least partical cut) but the DP insisted the whole cut.

    The chairman ( Ryu Seung-Min, ruling Saenuri Party) and coordinators ( Han Ki-Ho, Saenuri Party and Ahn Kyu-Baek, Democratic United Party) of the committee decided to hold a meeting again prior to the day’s general meeting but the concrete schedule was not decided yet. If gap between the parties is not to be narrowed, there is a possibility of vote that was mentioned by the chairman of the committee on Nov. 19.

    If vote is enforced, there is a possibility of the Saenuri party’s forceful sole disposal, excluding the DP, [if the DP opposes the vote itself.] that will bring the creeping and clash in the committee. The proportion of the committee is 9 from the Saenuri Party, 7 from the DP, and 1 of independent among the total 17 committee members.

    If the proposal on the Jeju naval base is to be passed by the National Defense committee, it will be examined again by the Budget and Balance Committee of the National Assembly (whose schedule is not known yet) that will bring final result probably by the end of December, which is after December 19 Presidential election . The whole numbers of the Budget and Balance committee members  are 51.

    Continuous pressure on the members of the National Defense and Budget and Balance committees will be important.

    Protest against the Jeju naval base project, Gangjeong village, Nov. 19, 2012/ The sign reads, “Cut the whole 200.9 billion won of the 2013 Jeju naval base project!’

     

    2. Important exposure in the Island Council inspection: Construction should be stopped and budget should be cut as total lies by the Office of Prime Minister were clearly proved out.

     

    Meanwhile on the same day, important testimony by a member of the [base design-] technical verification committee meeting (Prof. Kim Gil-Soo, Korea Maritime University) and simulation screening that shockingly exposed government lies were held in the Island provincial council (Administrative self-governing committee) during its inspection on the Promotion Committee on the Civilian-Military Complex Port for Tour Beauty.

    Related to budget matter, the Island council inspection clearly proves out that the remark by the Office of Prime Minister that it would hold simulation ‘show‘, accepting the demand by the Island government, is only an excuse to appropriate budget on base project next year, shutting down all the critiques on its enforcement of naval base construction.

    The main testimony by Prof. Kim Gil-Soo was that: The report on the result of the 2nd simulation by the Office of Prime Minister [on Feb. 23] is different from the proper position of the technical verification committee (on the entry/exit of 150,000 cruises in the Civilian-Military Complex Port for Tour Beauty project) who adopted its proposal in its 4th meeting on Feb.14, after its session from January 26 to February 14.

    It was also ‘confirmed’ that the Feb. 23, 2012 report that had been ordered by the Ministry of National Defense (MND) through Samsung C & T was adopted as a simulation verification report by the Office of prime Minister. The villagers have raised a big suspicion on it in March 27, 2012. See here.

     

    Reference: It is useful to remind that

    1. The President Lee Myung Bak declared to enforce the Jeju naval base project in the 4th anniversary of his inauguration on Feb. 22, 2012)

    2. Based on the above Feb. 23 simulation report, on Feb. 29, 2012, the Office of Prime Minister claimed in its nation policy control meeting that the Lee Myung Bak government has made a final decision in September, 2008, to build the Jeju naval base as the civilian-military Complex Port for Tour Beauty where the civilian and military co-exist together. The remark by the Office of Prime Minister was criticized by the critics for distortion of facts because it added that the port had been built ‘as the Jeju naval base by the agreement from the villagers in 2007.’ There has been no agreement by the majority of villagers on the project whatever it was named. Additionally when the base building was first decided under the Ex-Roh Moo-Hyun government, it was under a cover called ‘civilian-military PORT OF CALL,’ not the ‘civilian-military Complex PORT for Tour Beauty, ‘ a new cover under the Lee Myung-Bak government (refer to Cheong Wooksik, Oct. 25, 2012)

    3. The first simulation by the Ministry of National Defense(navy) was in 2009.

    Finally, it was confirmed that, with the current base design, it is not easy even for military vessels, not to mention cruise, to enter and exit port. There have been numerous investigations by people themselves on it that back such confirmation.  One of them is by the villagers themselves. Watch the video here.
    Photo: Jeju Sori, Nov. 19, 2012/ Prof. Kim Gil-Sou, a member of the technical verification committee formed under the Office of Prime Minister on Jan. 26, 2012,  has been recommended as a member of the committee by the Jeju Island. He is also a member of the civilian verification task force team of the Jeju Island.

     

    The focus of the Island Council inspection on the base design were:

    Whether there was a pressure by the Office of Prime Minister  on the committee’s discussion result, also related to the 150 billion won mentioned to be needed for change of base design

    Whether the 2nd simulation report by the Office of Prime Minister properly reflects the position of the technical verification committee

    Whether the base was originally designed solely for naval base

    Whether the base fits even for military vessels, not to mention 150,000 ton cruise

    During the National Assembly inspection on the government offices, there has been a suspicion that has been strongly raised that the Office of Prime Minister pressured the committee to adopt the result report for the base design not to be changed.

    Here is the rearranged translation of the Jeju media, mostly from the Headline Jeju.

     

    Photo: Headline Jeju, Nov. 19, 2012/ Island Council members, Park Joo-Hee and Park Won-Chul

     

    ◇ “From the beginning, the design was not for the civilian-military complex port.”

    Prof. Kim Gil-Sou pointed out that there were problems in the simulation data by the Ministry of National Defense in the beginning.

     

    Question by Park Joo-Hee, Island Council member:

    In the meeting minutes, the members of the technical verification committee, recommended by the Island Council to be the members of the committee, lastly asked to the navy personnel in charge of simulation, pointing out ‘Why is it that the simulation data of wind speed 15 knot while it should be set up to 27 knot’ and ‘navigation route is wrong.’ And there was the remark by the navy personnel that ‘It is because it is hard for cruise to enter[the port] if the data is set up to 27 knot.’

    Does it mean that the base design was not for the civilian-military complex port from the beginning?

    Answer by Prof. Kim Gil-Sou, technical verification committee member

    “We understand so. But I don’t know how the navy considers it.”

    Question by Park Joo-Hee

    “Given the contents of the 4th meeting minutes, it can be seen there was an outside pressure from the Office of Prime Minister. There appear remarks such as that the verification matter should be finalized in the early period.”

    Answer by Prof. Kim Gil-Sou

    “(The measure to finalize the matter quickly) has been maintained from the start to the end.”

     

    ◇ “There was no outside pressure. But [the committee members] must have felt such mood in the meetings.”

     

    Question by Park Won-Chul

    “Was there outside pressure from the chairman of the technical verification committee (on Chairman, Jeon Joon-Soo, please see here) and the Office of Prime Minister?

    Answer by Prof. Kim Gil-Sou

    “It was the chairman who worried about the possibility of construction stop and made remark on it. It became clear in the 4th meeting that the most worrisome thing for those was on the possibility of construction stop. We sensed that Office of Prime Minister was afraid of the possibility of construction stop if something advantageous to the Jeju [Island government] is brought on in the verification meeting.”

    Question by Park Won-Chul

    “Is it proper for us to see the reason that the Office of Prime Minister avoids construction stop is because the port has been designed ONLY as a naval base and there would be additional design costs [if the design is changed]? Is it proper for us to see that the chairman of the verification committee was clearly aware of that part, given many problems [in the design]?”

    Remark by Park Joo-Hee

    “There was a pressure from the Office of Prime Minister. It is confirmed.”

    Answer by Prof. Kim Gil-Sou

    “There was no outside pressure. But [the committee members] must have felt the mood in the meetings.”

     

    ◇ “ The 2nd simulation report by the Ministry of National Defense(MND) is not [the committee’s] proper report.”

     

    The next questions were related to the MND’s submission of 2nd simulation report on Feb. 23, as soon as the technical verification committee adopted its result report on Feb. 14.

    On the question of Prof. Kim’s view on the matter that the Samsung ordered works on simulation already before the the committee’s adoption of  its own report, here are Prof. Kim’s answers.

    Answer by Prof. Kim

    “We did not acknowledge the [Samsung report]. At first, we thought it is for a new simulation but we found later that [the Office of Prime Minister] was to replace [ours] to it, which had already been ordered in December.

    “(During the meeting) the government personnel asked us to hear the MND 2nd simulation. When we said we would not do that, they asked us again to take it as reference material. It was not our proper document. However, the government personnel changed their words later. They say as if we, the technical verification committee acknowledged it, but it is TOO WRONG. The committee has NEVER officially acknowledged it. That is why we have continuously claimed on correct simulation. Correct simulation has to be done even from now on.”

     

    ◇ Cruises can barely come alongside the pier only with the support by four (not two) tug boats

    The central and Island government have argued each other on the ‘show’ of simulation, on the supposition that 150,000 ton cruise can safely come alongside the pier with the support of two tug boats of 3,500 horse power.

    However, in the 2nd simulation movie made public during the Island Council inspection by Park Won-Chul, Island Council member, there are scenes that a cruise ship barely comes alongside the pier supported by  four tug boats.

    Given the movie, it is confirmed that the simulation was carried on with four tug boats during the entry/exit of cruise in all cases in the conditions of wind speed 27 knot and west part jetty harbor as the changeable.

    However in the MND report on the result of simulation verification, it recommends to operate two tug boats with 3500 HP in case of more than 24 knot wind speed in the south breakwater; and to rearrange harbor structure and operate two 3500 HP all the time so that it would relieve psychological pressure of using jetty dock when big cruise is operated in the west breakwater (conditioned by maximum 27 knot of wind speed)

    Prof. Kim Gil-Sou stated watching the movie. “It is not common that four tug boats follow cruise.” He also stated that it is for the first time he got to know it.

    According to him,

    “ Since the size of water surface area of cruise is big, it is impossible for cruise to come alongside the pier without four tug boats in the condition of wind speed 27 knot or more. When I pointed out that the entry of cruise would be difficult in the condition of a jetty dock in the west breakwater, [the design of the jetty dock] was changed to the changeable. However, changeable dock is very difficult to build from the point of view of harbor and bay engineering technology. The reason that it was changed to the changeable is because the (government and navy0 wanted to maintain its original purpose (construction without  base design change)

    Park Joo-Hee, Island Council member said, “ The Island government should be furious together on the objectively proved out facts today that; The tug boats are four not two; it was originally a design purely for naval base; It takes additional 150 billion won to change the design; even military vessels are difficult for entry and exit/and  the chairman of the committee remarked that there should be no construction stop.” She demanded construction stop and space for true discussion by the Island people.

    Park Won-Chul also demanded construction stop pointing out that there have been as much as 22 cases of violations of the license regulation of Public waters Act (the law on the reclamation on the public water and its vicinity surface )since last October , which have not been properly asked of responsibilities with charges. Park also demanded thorough measure against unreliable caisson production of which seven have been demanded by last typhoons through fact checks

     

    3. Still 24 night time entry/exit of construction trucks resumed in 10 days on Nov. 19

    The night time entry/exit of construction vehicles that started on Oct. 25 has been posed since Nov. 10, 2010. For the background of it, see here. On Nov. 19, the nightmare of 24 hour police mobilization and 24 hour people protest started again.

    Around 9am. Nov. 19, 2012/ Protesters blocking construction trucks
    Around 2:30 pm, Nov. 19, 2012/The construction companies poured down dirty water toward outside gate. The dirty water flew into the Gangjeong stream, one of the absolute preservation areas along with the Joongdeok coast to which the Gureombi Rock belongs.
    Around 2:30 pm, Nov. 19, 2012/ Dirty water from the naval base project committee building complex flows into the Gangjeong stream.
    Photo by Dolgorae Goon, Nov. 17, 2012/  Such crime like above happened on Nov. 17, Saturday, too.  For many more photos on the day, click here.
    Photo by Carol Rekinger/ Around 11pm, Nov. 19, 2012. For many more photos, click  here.
    Photo by Carol Rekinger/ Around 11pm, Nov. 19, 2012. For many more photos, click  here.
    Photo by Yange Gone/ Around 3am, Nov. 20, 2012. Sleepless people
    Photo by Lee Woo Ki/ Around 5am, Nov. 20, 2012.  Protestors barely sleep between police roughing out of them.

    ……………………………………………

    Reference:

    http://www.jejusori.net/news/articleView.html?idxno=122762
    결과도 조작하는데, 시뮬레이션 다시 한들 믿을수 있나
    2012.11.20 13:25:50

    http://www.jejudomin.co.kr/news/articleView.html?idxno=36479
    해군기지 크루즈 시뮬레이션 ‘엉터리’ 확인
    예인선 2척 아닌 4척…군함용 설계 불구 짜맞추기 행자위 행감서 동영상 공개 …김길수 교수 증언도
    2012.11.19 19:26:01

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165252
    제주해군기지 ‘거짓말’ 들통…”애초 민군복합항 아니었다”
    총리실 기술검증위 참여 김길수 교수, 도의회 출석 반박 증언
    ‘2차 시뮬레이션 보고서’?…’외압’?…’예인선 4척’?
    2012.11.19 18:35:16

    http://www.jejusori.net/news/articleView.html?idxno=122721
    총리실 크루즈 입출항 조작지시 의혹 사실로
    [행감] 총리실 검증위원 김길수 교수 참고인 출석 “시뮬레이션 보고서 인정 못해”
    2 012.11.19 17:19:13

    http://www.jejusori.net/news/articleView.html?idxno=122706
    총리실 검증위원 제주도의회서 무슨 말할까?
    2012.11.19 13:38:12
    [행감] 한국해양대 김길수 교수 참고인 출석…박원철 의원, 삼성물산 시뮬레이션 CD 입수

    http://www.jejusori.net/news/articleView.html?idxno=122722
    정부, 15만톤 크루즈 예인선 2척 필요도 ‘거짓말’
    2012.11.19 17:29:25

    http://www.mediajeju.com/news/articleView.html?idxno=136790
    “15만톤급 크루즈 선박 시뮬레이션, 처음부터 허구였다”
    박원철 의원 해군기지 입출항 시뮬레이션 동영상 최초 공개 … 예선 4척 사용 확인
    2012.11.19 16:41:55

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165256
    국회 ‘제주해군기지 예산’ 처리 연기…막바지 표결처리?
    유승민 “쟁점 합의안되면 표결로라도 처리”
    과반의석 확보 새누리 단독 처리 가능성도
    2012.11.19 19:50:50

    November 20, 2012

  • Civil disobedience movement spreads with the name of ‘Gureombi civil disobedience movement’

    Photo by Carol Rekinger, in her blog on Mr. Oh Cheul Geun

     

    Since Prof. Shin Yong-In made public civil disobedience movement on Nov. 11 ‘for the peaceful settlement of the conflict of the Jeju naval base project and for the realization of just law,’ the movement has been extended by the below  figures with their open statements.

    People have already been practicing it in contents in the struggle but with the name endowed, it is expected that the movement would more grow in coming days.

    Kim Seri informs:  ‘Recently, young Korean writers gathering their will to save the village, formed a group called ‘Writers’ Action 1219 (* December 19 is a date for the ROK Presidential election).’  It is informed that about 22 young writers will visit Gangjeong in the morning of Nov. 21 and will make an important statement [including on Gangjeong peace library project] and recite writings. And they are told to state on their participation in civil disobedience movement and to join the struggle at the same time . See here and here.’

    Otherwise, the below is a collection of open statements (excerpted translation) by  four figures  who joined the civil disobedience movement from Nov. 13 to 15.

    The people who join the civil disobedience movement commonly demand:

    The Government should respect the Constitution that reads to respect people’s basic rights
    The Jeju naval base project should be revoked!
    Cut the 200.9 billion won of the 2013 Jeju naval base project
    The Jeju naval base construction(destruction) should be stopped since the legality enforced with lies, betrayal, illegality, law-evasiveness and violence is a clear proof of illegality.
    The Government, navy and police should immediately stop violence.
    Free all the conscientious prisoners!
    The related personnel to the exposed problems on the Jeju naval base construction during the National Assembly inspection on the government offices should be responsible for charges.

    Otherwise Carol Reckinger, a photographer, is making wonderful records on the civil disobedience movement in Gangjeong. Please visit her blog.

    Jeju naval base Budget Cut Campaign. Renowned entertainer Ms. Kim Mee-hwa (Post by Regina Pyon)

     

    Rev. Choi Hun-Kook, Chairman of the Christian Measure Committee to Revoke the Jeju Naval Base Project

    Photo by Carol Rekinger, in her blog on civil disobedience movement/ Rev. Choi Hun Kook is carried away by the Police.

    The article 13 of South Korean Constitution stipulates the role of state for the social weak, considering the basic rights to live most important. The article 1 of the Bonn Constitution (Basic Law For The Federal Republic of  Germany) talks about the inviolable on the dignity of human beings as well as stipulates to make best effort to protect the human rights of the economical and social weak. Those mean that law should be a standard for every citizen to live human life. In the country where money and power are concentrated, to have a virtue of concession to the weak is established as the basis of law. It is because of it that the function of law which is a  regulation to set up the social community  order becomes the function of good will for the protection of  human rights and the weak.[..] Facing against the state power executed with physical power for the enforcement of the Jeju naval base construction, being reasoned that vicious law -used as the tool of violence- is positive law, I am joining this movement as a form of civil disobedience from the consciousness of religious person, which is a just act based on the justice of God.

    (Rev. Choi Hun-Kook, Nov. 13. From his statement titled, ‘The future of life and peace: Entering into the civil disobedience movement in the Gangjeong village, Jeju!’ See the original Korean statement, here.)

     

    Koh Gil-Chun, Jeju artist

    Photo: Jeju artist Koh Gil-Chun in front of construction gate on Nov. 14, with the sign that reads, ‘No Jeju US naval base, No US Nuclear Aircraft Carrier’)

    Currently, the Gangjeong village is being trampled down of such perfect “life,” by violence and greed. Also after April 3rd [massacre and people’s uprising from 1947 to 1954], “human rights” is being trampled down by state power in the Jeju Island. Even though it is clear that it would be used as the US base, the [state power] unilaterally enforces sacrifices of [the Island people] for fake security and puts against justly raised different opinions with the bridles of labels such as ‘Pro-North Korea,’ and even  ‘Reds’. The state is inciting greed of the Island people with the bite of so-called economic development. Any economic development will only profit the pockets of the rich again. The Jeju Island would be destined to take only the debt of destruction [..] I am to stand sided with the law of consciousness in the site of such treason, not to regret my life as one of the Jeju Island citizen and artist.[..] I urgently appeal to many citizens, Jeju Island people, and artists to join this civil disobedience movement. Starting on Nov. 14, I will stand in front of construction gate with peacekeepers, with the aspiration of every conflict to be peacefully settled, every 2pm to midnight, Wednesday.

    (Koh Gil-Chun, Jeju artist, Nov. 14, 2012. From his statement titled ‘Opposing the enforcement on the Jeju naval base construction, I join the civil disobedience movement from the heart that wants peaceful settlement.’ See the original Korean statement here.)

     

    Lim Borah, Vice-Minister of the Hyangrin Church, the Presbyterian Church in the Republic of Korea

    Photo by Jang Hyun-woo/ Rev. Lim Borah holds herself together with peacekeepers in front of construction gate on Nov. 16 (left in the photo). See also the photos by Carol Rekinger, in her blog on Rev. Lim

    I will join the civil disobedience movement from the start of 100 bows for life and peace in the morning to the last time of construction vehicles’ passage on the day of Nov. 16, Friday. Civil disobedience movement is another name of direct action named ‘Manshijitan (that means ‘10,000 citizens scold’) that started last spring. Now facing, beside the Manshijitan incident, prosecution and judgment of the 1st trial, under the charges of obstruction of business by the incident called Churchmen Entering the Gureombi Rock on April 3rd, 2012 and by stopping construction vehicles, I declare participation in the civil disobedience movement that is to save democratic procedures in non-violent way and to recover my consciousness as a devotee. It is because I believe in that the civil disobedience movement will stop the enforcement of the Jeju naval base construction and will be the kindling to save the Gangjeong village. [..] We are not the people to be tamed by violent state power, fine or prison punishment. There is no fear for the people who make effort to save peace. There is no happier thing for the devotees to suffer from their practice of Jesus’ gospels with their whole bodies.

    (Lim Borah, Vice-Minister of the Hyangrin Church, the Presbyterian Church in the Republic of Korea, Nov. 15, 2012. From her statement titled, ‘I join the civil disobedience movement to revoke the Jeju naval base project and to recover faith consciousness. See the original Korean statement, here.)

     

    Oh Cheul Geun, a democratic citizen

    Photo by Cho Sung-Bong / Mr. Oh Cheul Geun in the rain.

    I am Oh Cheul Geun(66). I have practiced three steps one bow in Gangjeong from Nov. 14, 2011 to April 10, 2012. I am doing it again til I arrive the main construction gate of the Gangjeong village everyday since Oct. 24. I always wear a [traditional] funeral cloth when I do three steps one bow. There are four reasons. First, it means, death of sovereignty, second, death of human rights, third, death of democracy and last, death of the Gureombi Rock. I fully feel them as my responsibility and pray for everything to be returned back to its original place, by practicing three steps one bow everyday. Then I became to join the civil disobedience movement. As I feel that prayer cannot solely solve the matters and as I see peacekeepers and villagers who are bruised and injured and feel difficulty everyday, I became to keep pace with direct resistance, too, by joining civil disobedience movement.[..] Even though the legal system of the Republic of Korea is based on the spirit of Constitution espoused of Democracy principle, positive law has become creeping, even distorting the Constitution. To change the reality when enforcement decree and regulations made by the administrative reign over the Constitution,   I became to stand countering against the police violence blow because I desperately hope many more citizens to join this civil disobedience movement.

    (Oh Cheul-Geun, a democratic citizen on Nov. 15, 2012. From his statement titled, “Joining the Gureombi civil disobedience movement to stop the illegal Jeju naval base construction. See his Korean statement here. )

     

    Photo by Carol Reckinger, The Hunger Strike of Sungshim Jang

    …………………………………………………..

     As of Nov. 18

    Mr. Kim Bok-Chul (No. 598), 160th day in prison

    Rev. Jeong Yeon-Gil (No. 187), 74th day in prison

    Mr. Park Suk-Jin (No. 188), 74th day in prison

    Mr. Park Seung-Ho (No. 290) 65th day in prison

    Fr. Lee Young Chan (No. 407), 25th day in prison

    Please write letters of support to each of the above to the address of Jeju prison, 161, Ora-2dong, Jeju City, Jeju, the Peace Island

    Free all  peace activists and villagers!

    Stop the fake naval base! Stop the illegal construction!

    Cut all 2013 naval base budgets!

    (Source: Cho Sung-Bong)

    …………………………………………..

    Reference

    http://cafe.daum.net/peacekj/5htg/110

    [최헌국] 생명평화의 미래! 제주강정마을에서 시민불복종 운동에 나서며

     

    http://cafe.daum.net/peacekj/5htg/111

    [고길천] 제주해군기지 건설강행을 반대하며, 평화적인 해결을 바라는 마음으로 시민불복종운동에 동참합니다.

     

    http://cafe.daum.net/peacekj/5htg/114

    [임보라목사님] 제주해군기지 건설 백지화와 신앙 양심의 회복을 위해 시민불복종 운동에 동참합니다.

     

    http://cafe.daum.net/peacekj/49kU/2085

    [오철근]제주해군기지 불법공사 중단을 위한 구럼비 시민불복종운동에 동참하며

     

    November 18, 2012

  • Island governor sides with the navy on budget despite suspicious breakwater construction before simulation


    Photo by Cho Sung-Bong/ The 14th caisson. Despite the Island governor’s demand to the navy on Oct. 30 to stop the input of caisson on the sea until the finish of simulation on 150,000 ton cruise, the navy thoroughly ignores that. The navy-contracted company, Samsung C & T moved the 14th 8,800 ton caisson from the Hwasoon port to Gangjeong sea on Nov. 15. See more photos by Cho, here.

     

    During both days of Nov. 16 and 17, issues regarding the budget on the Jeju navy base project were hot, especially with the Island governor’s request to the visiting Democratic United Party members to pass the budget on subsidiary condition. The villagers criticized on it with statement (see its translation on No.3). This article is a summary of four subjects during both days.

    The four subjects are:

    1. Even no discussion: National Assembly discussion on budget was postponed again because of gap between the parties.
    2. Controversy on the matter of fair simulation
    3. Island governor, Woo Keun-Min, sides with the navy. Villagers criticize his will to pass the budget
    4. Suspicion on the navy’s enforcement of breakwater construction before simulation is raised.
    …………………………………………………………………………………………………………..

    1. Even no discussion: National Assembly discussion on budget was postponed again because of gap between the parties.

     The Jeju media report:

    The National Defense committee of the ROK National Assembly had the plan to hold the 3rd Budget and Balance sub-committee meeting in the morning of Nov. 16. It was to talk on the direction on the disposal on the 200.966 billion won budget for the Jeju naval base project, 2013. However the committee could not even discuss on it.

    The Budget and Balance sub-committee has had the meetings on Nov. 7 to 8 and Nov. 12 but those have been with no result as the parties could only confirm different positions between them.

    The National Defense Committee plans to have its general meeting on Nov. 19, Monday, and will try to reach to an agreement. If it is without result again, it will consider on opening the Budget and Balance sub-committee again.

    In the Nov. 19 meeting, talks on the Jeju naval base and inspection on K2 tank will be talked.

    The biggest reason that the disposal on the Jeju naval base budget has met difficulty is because of big gap between the ruling and opposition parties.

    The ruling Saenuri Party (New Frontier party) is insisting its position to pass the budget as the original proposal by the Defense Acquision Program Administration (DAPA). However the Democratic United Party (DP, afterward), the main opposition party has different opinions of whole cut, part cut and conditional pass within the party.

    The National Assembly has cut 96% (127.8 billion won) of 132.7 billion budget last year. However, unused budget of about 107 billion won in 2011 was transferred to 2012 with law-evasive way.

    How you can help? Please pressure as seen in No. 2 of here. The pressure works.

     

    2. Controversy on the matter of fair simulation

    Otherwise, regarding the decision by the Office of Prime Minister on Nov. 15 that it would ‘show’ (not ‘verification) on the simulation of 150,000 ton cruises, accepting the request by the Jeju island government, anti-base groups criticized on it on Nov. 16, saying, “The [Office’s] acceptance on simulation means that the Office acknowledges itself that there was problem on the trust matter in the 2nd simulation.”

    The groups including the Gangjeong Village Association, Pan-Island and National Organizing Committees  to stop the Jeju naval base, criticized that the Prime Minister Office’s acceptance of simulation is merely to pass the budget on the naval base project.

    The groups also said:

    “However, the limitations in the conditions of simulation that the Jeju Island government and Office of Prime Minister agree with each other are too clear to clarify on the citizens’ suspicions on the safety of the navigation by 150,000 ton cruises . The Jeju Island government has asked simulations on five types but the Office reduced them into two because the Office hard pressured the Island government to concede it.

    The groups also pointed out:

    “Among the three researchers in the ‘show’ team, two are recommended by the Government. Further one of them, Lee Yoon-Suk, professor of Maritime University has already brought serious controversy on objectivity and fairness matters in his order of service in the second simulation [of which the report came out on Feb. 23, 2012].”

     

    Reference:

    On July 18, 2012, the Jeju-based or origin four National Assembly members of Kang Chang-Il, Kim U-Nam, and Jan Hana (All DP) have raised an issue that the 2nd simulation on the control of ships, which should be based on observing regulations, has not been properly carried out. The four members pointed out that there are serious flaws in the 2nd simulation and demanded the Government and navy temporary stop of construction and observance on the National Assembly subsidiary opinion in 2011.

    In October, 2011, the sub-investigation committee on the Jeju naval base project that belonged to the Budget and Balance Committee of the National Assembly recommended to the Government to “verify on the matter of free entry/exit of port for two 150,000 cruises through the specialized 3rd institute in need. However, the Ministry of National Defense unilaterally carried out simulation and made public the 2nd report in February 23, 2012.

    Otherwise, the Ministry of Land, Transportation and Maritime Affairs submitted its opinion statement to the four members around July that it is desirable to carry on simulation again because there is a great risk of danger by occurrence of accident, with the low variables given in the 2nd simulation scenario.

    (See the Korean language Hankyoreh article on July 18, 2012)

     

    3. Island governor Woo Keun-Min sides with the navy. Villagers criticize his will to pass the  budget

    Four members of the Democratic United Party, belong to the Budget and Balance Committee of the National Assembly visited Woo Keun-Min, Island governor in the afternoon of Nov. 16. The four members are Park Min-Soo, Yang Seung-Jo, Choi Min-Hee and Choi Jae-Sung.

    The total number of the members in the Budget and Balance Committee is 51. Among them, 21 belong to the DP.

    To people’s indignation, the Island governor Woo asked the DP members to pass the budget on the condition that they stipulate the ‘subsidiary opinion’ of the National assembly last year. To be concrete, he suggested to stipulate that ‘[the Government] execute budget on the premise that the recommended items by the sub-investigation committee on the Jeju naval base under the Budget and Balance Committee of the National Assembly last year to be carried out in substance.” (For detail, see the reference in the below)

    Hearing the governor, the four members promised to the governor that they would actively support for the proposed items by the Jeju Island governor in the National Assembly. However, it is still uncertain for the DP as the party has taken construction stop and re-examination of project as the party opinion since April 11 general election, despite its recent being stirred regarding budget.

    Source: Jeju Sori, Nov. 16, 2012. Governor Woo (right in the photo) asked four visiting members of DP belong to the Budget and Balance Committee of the National Assembly to pass the budget on naval base on Nov. 16, 2012.

     

    Here is the villagers’ statement refuting on the governor’s such behavior (translated from the original Korean statement):

     

    Why does Island governor, Woo Keun-Min represent the interest of navy?

    Island Governor Woo has finally revealed his hidden intention.

    While he has shown his shifting attitude many times such as in the hearing on the navy in May when he was even seem to consider to make order the navy to stop construction, [on Nov. 16] he requested to [the visiting four DP members] to pass the budget [on the Jeju naval base project] with subsidiary conditions as the budget got brake in the National Assembly.

    It has been clearly turned out that the Jeju naval base is a project that would make the Jeju Island to be militarized with the posturing cover of civilian-military complex. The proof is that it is conditioned that ships’ entry and exit of port is only possible under the permission of jurisdiction unit commander in the revision on the enforcement order on Protection of Military Bases and Installations Act. It has also been exposed that the CNFK (Commander of US Navy Forces of Korea) has demanded the layout possible for nuclear aircraft carrier to come alongside the pier and it has been accepted in building of it.

    Through exposed meeting minutes by the technical verification committee under the Minister of Prime Office, we could also confirm the will of the Government who is to drive the project without base design change. The Prime Minister office accepted the joint simulation show to merely pass the naval base budget next year in its hidden intention. It is the calculation of timing that it is to that extent only once the National Assembly passes budget biting the [government acceptance] of simulation verification that could be done only next year.

    Combining all those situations. it is clear that the ROK Government neither concerns with the interest of the Jeju Island nor the public sentiment of the Island people. It is mad only to drive for military base project, hammering away to ignore even the position of the Jeju Island that is stepping toward international tourism site and whose role of bridge in the international civilian diplomacy is being promoted.

    Meanwhile the Jeju naval base project committee has enforced construction (destruction) hourly ignoring the demands by the Island governor. As if deriding his words that there should NOT be breakwater construction before verification, it is enforcing actual breakwater construction by stationing caisson, only without sands filled inside, and processing reclamation in the Metboori (* east tip of the project area) for the construction of breakwater shore protection. (See the below)

    In such situation, governor Woo demanded to the National Assembly to pass the 2013 Jeju naval base budget when the Office of Prime Minister agreed with re-revelation on simulation, which is not re-verification. Even though he says he conditioned that the budget should be executed under proper verification, there is no reason that Island governor demand to pass the budget since the budget that might be passed by then purely comes from the Ministry of National Defense, not from the Ministry of Land, Transportation and Maritime Affairs.

    Why does governor Woo demand the budget from the Ministry of National Defense?

    Is he entirely forgetting that he is the governor of the Jeju Special Self-Governing Island?

    Is he naively expecting that the navy would step for proper verification if it is allocated with budget?

    Why is he requesting to pass the budget in prior to a proper simulation while the navy could be re- allocated with special budget after it as it wants?

    Finally it was proved out that the Island governor Woo Keun-Min has no concern with whether the Jeju naval base would be a proper civilian-military complex port for Tour Beauty or not; and whether the Island people would get any damage from it or not. We don’t need Island governor who takes the lead as the representative of the navy and save only the interest of Samsung and Daelim.

    Nov. 17. 2012

    Gangjeong Village Association

    Reference:

    On Nov. 7, 2011, the sub-investigation committee on the Jeju naval base project under the Budget and Balance Committee of the National Assembly stipulated two recommendation items when they adopted its activity report.

    The first was the recommendation to revise the enforcement decree on the Port Act and Enforcement Decree on Protection of Military Bases and Installations Act and to conclude on the protocol on the joint use on the civilian-military harbor and bay, so that there should be no worry that the Jeju naval base would be operated centered on military port.

    The second is a fair simulation on the possibility of entry & exit by 150,000 ton cruises

    The revision on the decree has been carried out on June 29 while the talks on the conclusion on the protocol is still being processed and there remains the matter of simulation verification. The Jeju Island expects the simulation period at the end of December or January, next year.

    Otherwise, beside budget, governor Woo requested supports on other budgets. Among them, one of the noticeable is request for service work on the ‘basic plan to form the global environmental herb,’ which is for smooth drive of following measure after the 2012 WCC (0.7 billion won)

    (Translated: See the Jeju Sori on Nov. 16, here)

     

    4. Suspicion on the navy’s enforcement of breakwater construction before simulation is raised.

     

    On Oct. 18, 2012, Governor Woo has declared to the villagers in the talk meeting with them that he would ‘stop the breakwater construction in the Gangjeong Sea without fail’ even though it is difficult for him to order construction stop before simulation.”

    On May 1, 2012, even Park Geun-Hye, the daughter of military dictatorship and Presidential runner of the ruling conservative Saenuri Paty said that simulation verification has to be prior to construction on break water. See the Korean article on it here.

    However, the village has raised suspicion on Nov. 17 that the construction being done in the Metboori coast(in the east tip of the naval base project area) could be breakwater construction.

    Source: Jeju Sori, Nov. 17, 2012 (Original source: Gangjeong Village Association)/ Construction in the Metboori coast (east tip of the project area). In the map, the spot is marked with red color,  planned to be the east breakwater shore protection. The current construction on the spot  raises a suspicion that the navy is enforcing construction on breakwater by reclaiming land from the sea before simulation verification.  For more photos by Cho Sung-Bong, see here. The east part is also for docks for submarines and small ships.

     

    Given the photos by movie director Cho Sung-Bong, the sands and stones being put into the sea are in violation of the EIA. Those should be put into the sea after the washing process on the land. There is no washing facility for sands and stones inside the construction area and those coming from the field are directly put into the sea.”

    “The biggest problem is that substantial breakwater construction is being done. Given the photo (above), it is the area spot being reclaimed from the Metboori coast to the sea, along the silt protectors. This area belongs to the east breakwater shore protection ( * in charge of Daelim) and outer facilities on the base layout map.”  See the construction map here.

    “ not only that, the navy is processing the substantial construction on the west and south breakwaters, too, by stationing caissons. By when will the Island government on-look companies’ such law-evasive construction.

    Source: Headline Jeju, Nov. 17, 2012/ Working ships to station caissons to build west breakwater.
    Source: Headline Jeju, Nov. 17, 2012/ Working ships to station caissons to build southbreakwater.

     

    ………………………………………………..

    Reference

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165031
    국방위, 제주해군기지 예산 진통…또 다시 처리 연기
    예산소위서 결론 못내…19일 전체회의서 이견조율
    2012.11.16 12:25:18

    http://www.jejusori.net/news/articleView.html?idxno=122626
    제주해군기지 예산 진통, 19일 전체회의서 논의
    2012.11.16 11:54:40

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165052
    강정-범대위 “총리실 시뮬레이션, 공정한 검증 이뤄져야”
    “총리실 수용은 객관성과 공정성 문제 스스로 인정한 것”
    2012.11.16 15:16:55

    http://www.jejusori.net/news/articleView.html?idxno=122634
    제주해군기지 시뮬레이션, 공정성 논란 고개
    2012.11.16 14:40:00

    http://www.jejusori.net/news/articleView.html?idxno=122562
    시뮬레이션 준비만 4~6주…올해 불가능할 듯
    2012.11.15 10:34:53

    (http://www.hani.co.kr/arti/society/area/543194.html
    “해군기지 2 차 시뮬레이션 중대 오류”
    제주 출신 국회의원, 공사 중단 요구
    국토부”선박 출입때 사고 위험 커”
    2012.07.18 19:25

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165050
    국회 예결위 의원들 제주 방문, 예산요청 사안 현장확인
    민주당 소속 의원 4명…우 지사와 면담
    2012.11.16 15:00:30

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165112
    ‘제주해군기지 예산’ 조건부 통과 건의에 강력 반발
    강정마을회 “우근민 지사는 왜 해군의 이익 대변하나”
    2012.11.17 11:28:51

    http://www.jejusori.net/news/articleView.html?idxno=122648
    내년 제주해군기지 예산, ‘부대의견’ 달아 승인?
    2012.11.16 17:18:38

    http://www.sisajeju.com/news/articleView.html?idxno=164430
    해군기지 예산 난항…국회 예결위 민주의원들 제주지사 만나
    제주도 “예산승인시 부대의견 명시”건의…산지천 현장방문
    2012.11.16 18:07:34

    http://www.jejusori.net/news/articleView.html?idxno=122661
    강정 “방파제공사만큼은 안한다더니•••”
    2012.11.17 13:59:22

    http://www.headlinejeju.co.kr/news/articleView.html?idxno=165121
    “검증도 안하고, 이미 제주해군기지 방파제 공사 시작?”
    강정마을회, ‘매립공사’ 조기착수 의혹 제기
    2012.11.17 15:11:35

    November 18, 2012

  • No night time entry of trucks for a week. What’s happening?/ Night time construction noise has brought complaints from Hwasoon residents

    Photo by Jang Hyun-Woo on Nov. 11/ ‘The blue-roofed housed are inferred to be the residential buildings by  workers.’ See Jang’s more photos of construction site where destruction is being done in thorough violation of the EIA, see here.

     

    1. Workers’ sabotage? Not confirmed yet.

    There have been no night time entry/ exit of cement mixer trucks since last Saturday, Nov. 10. Even though it is told that 24 hour construction is continued inside the construction site. As of Nov. 16, it became a week that cement mixer trucks did not enter or exit the gates in the nights. The police would withdraw from the field in the evening and people could fortunately take break in the nights. On Nov. 16, the last struggle in front of the construction gates was at around 5:40 pm since there were no more trucks and police withdrew after it.

    What’s happening? Is it just a part of normal process for caisson production that needs care period by the next caisson production? Or are the police tired to be mobilized in the nights since they think the navy is crazy, too, to rush for the construction even in the nights?

    There is information that needs much more factual check. So this is just for reference. According to information that should be checked in various aspects, it is told that the Korean workers inside the construction site are sabotaging, intending to rebel against unfair work management.

    It has been known that about 100 workers from Vietnam and other countries have entered into the naval base construction site in the village just before 24 hour construction (destruction). We could imagine their poor work conditions, exploited with low wages.

    And it seems Korean workers are also exploited, which should be never surprising news.

    According to  information, the navy-contracted companies hiring Korean workers laid off them after the workers were mobilized to teach Vietnamese workers how to work.

    In the morning of Nov. 16, peacekeepers in the protest field were told that the construction company unilaterally laid off 18 workers. A laid-off worker coming out of the site told people.

    Beside 18 laid off Korean workers, it is told that some Vietnam workers quit the jobs that morning because they felt so cold to stay inside the containers in the coast within the construction area.

    Regarding 18 laid-off Korean workers, they are workers all working with reinforced rods. There were originally 30 workers working with reinforced rods and now 12 workers are left. The company has made two caissons and the 3rd caisson has been posed in process. It is told that Vietnamese workers would fill the empty job spots.

    While the daily wage of a Vietnam worker is 60,000 won, a South Korean worker gets 150,000 won, it is told. The Korean workers are told to wonder why such so-called important national policy project is built by foreign workers and why the Vietnamese workers often take records of photos on construction site with their mobile phones.

    It is told that while the director of the field is the one who has worked in Hwasoon, the workers here in Gangjeong construction site are employed by the Daelim-subcontracted company called the Jeju T & C, of which the headquarter is told to be in Seoul and which they have never been informed before. The workers were employed from all over the country and there is no specific leader among them.

    The workers have originally been told from the construction company that they would get 4 million won for a month for two years with the job. But the 18 laid-off workers could not get any dismissal allowance since their work term was less than two months. According to the Ministry of Labor, dismissal allowance is given to workers of more than three months. To be worse, they could not get wage from the companies yet. It is told that the companies said to them that they would send wage through their bank accounts later.

    The unfair work management in the Jeju naval base project has already been exposed though in part in the Hwasoon workers’ case. See No. 3, here. The bad and suspicious work conditions for workers are being leaked…

     

    Update on Nov. 17: It is told that beside the Korean workers who are told to have intended strike, Vietnamese workers are also in the mood of organizing strike.  It is clear the caisson work inside the naval base construction site in the Gangjeong village is not being processed well. Even during the daytime on Nov. 17, Saturday, there were no more cement mixer trucks entering after 3:30pm. The police withdrew at the time. It is unusual considering that construction (destruction) has been going on by late evening on Saturday even before 24 hour construction.

    Also, it is told that the employees of navy-contracted security companies are complaining on illegal registration of companies (* for that, see page 4,  Nov. newsletter) and delayed payment of wages. They are in the move to file a suit on unjust employment to the Ministry of Employment and Labor.

    Still despite such already exposed unjust construction including unfair work conditions, on Nov. 17, the Seogwipo City Hall, being pressured by the navy, sent a notice  to the villagers that if the villagers are not volunteering to remove their sit-in tents across construction gates, it will carry on forceful execution of demolition of them. The villagers and peacekeepers are ready to fight to save the sit-in tents next week.

    It also became clear that the residential households nearby the construction site in the Gangjeong village are suffering for the noise during the night time construction. One resident told that she felt like in the hell when she heard the noise of crane during the night.

     

    2. Night time construction noise has brought complaints from Hwasoon residents

     

    Photo: Jemin Ilbo, Nov. 8, 2012, Caisson built in the Hwasoon port

     

    There is not only a matter of work conditions for workers. The 24 hour construction to build 8,800 ton caissons in Hwasoon port (40 minutes car distance eastward from the Gangjeong village) has already been complained by the nearby residents.

    The Jemin Ilbo on Nov. 8 reported (Excerpted translation):

    The residents in Dongha-dong and Ungeun-dong, Hwasoon-li, Andeok myeon (* myeon (township) is the subdivision of gun (county)), in the Seogwipo city are being damaged by the construction noise related to the production of caissons that are put in the naval base construction area in Gangjeong village.

    The residents are especially protesting to Samsung C & T, saying they are experiencing discomfort because of greater noise in the nights as the caisson production is being done for 24 hours.

    The residents have demanded to the Samsung C & T to stop construction from 10pm to 5am and to take prevention measures to reduce the damage by noise.

    However, the position of the Samsung C & T is that it must progress construction even in the night time, reasoning that the caisson production needs unstopping construction due to technical matter; that there would be problem in quality management if construction is stopped in the night; and that the construction period has been delayed for several months.

    Eventually there have been meetings in last September and at the end of October, by the related personnel to solve the civilian complaints on construction noise by the caisson productions, for which local residents, contracted company personnel, and government officers in the Seogwipo City and Andeok Myeon joined. However, solution measures have not been provided yet.

    Kim Tae-Un, Chairman of Hwasoon li stated that “The residents nearby the construction site are being harmed not to be able to sleep again if they woke up from sleep due to abrupt noise occurring from the cranes in the dead of night… Even though we have raised noise issue from the beginning of this year, it has not been properly settled. And the residents are now standing up against it”.

    …………………………………………………

    Reference

    http://www.jemin.com/news/articleView.html?idxno=298043
    심야시간에도 공사 소음 피해 극심
    화순리서 해군기지 투입할 케이슨 24시간 제작
    주민들 “밤 10시~새벽 5시 공사중단 해야”
    시공사 “공사기법•공기문제로 부득이 강행”
    2012 년 11월 8일

    …………………………………………………

    An interesting article to look at:

    http://english.hani.co.kr/arti/english_edition/e_international/560972.html
    Korean workers underpaid on US military bases
    Nov.16,2012 16:33 KST

    November 17, 2012

  • Gangjeong Village Story: Monthly News from the Struggle | November Issue

    In this month’s issue:
    National Grand March for Life and Peace Comes to a close, outrageous findings in National Assembly inspections, Jesuit priest imprisoned, illegal security company hired to guard the construction site, 24-Hour construction begins and much more!

    Download PDF

    November 16, 2012

←Previous Page Next Page→

© 2025

Save Jeju Now